FireCADCalc

Demand Factor, Load Factor and Diversity Factor

Demand factor, load factor, diversity factor and coincidence factor of an electrical installation from connected load, maximum demand and energy used.

Thermal power plantProcess steam and utilities

Inputs

Examples: 1 000 kW connected, 600 kW demand, 259 200 kWh in 720 h250 kW, 180 kW, 60 000 kWh in 744 h5 MW, 3.2 MW, 1.5 GWh in 720 h

Results

Demand factor (maximum demand / connected load)72.000%
Average load80.645kW
Load factor (average / maximum demand)44.803%
Diversity factor (sum of individual maxima / maximum demand)1.2778
Coincidence factor (1 / diversity factor)0.78261

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 1 000 kW connected, 600 kW demand, 259 200 kWh in 720 h. The inputs, in the units selected above:

InputValue
Connected load1,000.0 kW
Maximum demand of the installation600.00 kW
Energy used in the period259,200 kWh
Length of the period720.00 h
Sum of the individual maximum demands750.00 kW

Applying the formula below gives:

ResultValue
Demand factor (maximum demand / connected load)60.000 %
Average load360.00 kW
Load factor (average / maximum demand)60.000 %
Diversity factor (sum of individual maxima / maximum demand)1.2500
Coincidence factor (1 / diversity factor)0.80000

Open this example in the calculator and change any input.

Formula

\(DF = \frac{P_{md}}{P_c}, \quad LF = \frac{E / t}{P_{md}}, \quad F_d = \frac{\Sigma P_i}{P_{md}}\)

Variables

Symbol Meaning SI unit
\(P_c\) Connected load W
\(P_{md}\) Maximum demand of the installation W
\(E\) Energy used in the period J
\(t\) Length of the period s
\(\Sigma P_i\) Sum of the individual maximum demands W
\(DF\) Demand factor (maximum demand / connected load) -
\(P_{avg}\) Average load W
\(LF\) Load factor (average / maximum demand) -
\(F_d\) Diversity factor (sum of individual maxima / maximum demand) -
\(F_c\) Coincidence factor (1 / diversity factor) -

Method and standards

Definitions.

Where it is used

  • Transformer and feeder sizing.
  • Tariff analysis.
  • Electrical examinations.

Common mistakes

  • Mixing kW and kVA.
  • Inverting the diversity factor.

Assumptions and limits

  • One period; kW values. A load factor above 1 is flagged as inconsistent data.

References

  • Definitions of demand
  • load and diversity factors (IEC 60050-691 terminology)

Questions and answers

What are the factors for 1000 kW connected, 600 kW maximum demand and 259 200 kWh in 720 h?

Demand factor 0.60, average load 360 kW, load factor 0.60.

Is diversity factor above or below 1?

By the IEC definition used here, 1 or more. Some texts use its inverse, the coincidence factor.

Why does load factor matter?

A higher load factor spreads the demand charge over more kWh.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.