Unconventional Well Decline: Duong and Logistic Growth Models

Rate and cumulative production of a shale or tight well by Duong's model and by the logistic growth model, with the instantaneous decline rate and b-factor.

Process steam and utilitiesRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: Same fits at 5 yearsGas well fits, 90 days

Accepted: 0.54344 to 5,434,400 bbl/d
Accepted: 0.01 to 100
Accepted: 0.5 to 3
Accepted: 0.0062898 to 6.29E+9 bbl
Accepted: 0.001 to 100,000,000
Accepted: 0.1 to 2
Accepted: 1 to 115,740 d

Results

Both models suit long transient linear flow in fractured shale and tight wells, where Arps's b exceeds 1. Fit a and m (Duong) from a log-log plot of q/N_p against t, and K, a and n (LGM) by matching cumulative production. The LGM never exceeds K; Duong is unbounded.

Rate (Duong)1,148.1bbl/d
Cumulative production (Duong)169,119bbl
Rate (logistic growth)6,246.9bbl/d
Cumulative production (logistic growth)1,222,182bbl
Instantaneous decline rate (LGM), per day0.010889
Instantaneous b-factor (LGM)0.59892

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Same fits at 5 years. The inputs, in the units selected above:

InputValue
Duong: rate at day 150.000 bbl/d
Duong intercept a (q/N_p = a t^{−m})3.9747 -
Duong slope m1.4550 -
LGM: ultimate recovery (carrying capacity)800,000 bbl
LGM constant a (days^n)221.25 -
LGM exponent n1.0980 -
Time on production1,826.0 d

Applying the formula below gives:

ResultValue
Rate (Duong)4.1960 bbl/d
Cumulative production (Duong)58,751 bbl
Rate (logistic growth)24.942 bbl/d
Cumulative production (logistic growth)756,112 bbl
Instantaneous decline rate (LGM), per day0.001083
Instantaneous b-factor (LGM)0.47371

Open this example in the calculator and change any input.

Formula

\(q = q_1t^{-m}\exp\left[\frac{a}{1 - m}(t^{1-m} - 1)\right], \quad N_p = \frac{q_1}{a}\exp\left[\frac{a}{1 - m}(t^{1-m} - 1)\right], \quad N_p = \frac{Kt^n}{a + t^n}, \quad q = \frac{Kna\,t^{n-1}}{(a + t^n)^2}\)

Variables

Symbol Meaning SI unit
\(q_1\) Duong: rate at day 1 m³/s
\(a\) Duong intercept a (q/N_p = a t^{−m}) -
\(m\) Duong slope m -
\(K\) LGM: ultimate recovery (carrying capacity) m³
\(a_{LGM}\) LGM constant a (days^n) -
\(n\) LGM exponent n -
\(t\) Time on production s
\(q_{Duong}\) Rate (Duong) m³/s
\(N_{p,Duong}\) Cumulative production (Duong) m³
\(q_{LGM}\) Rate (logistic growth) m³/s
\(N_{p,LGM}\) Cumulative production (logistic growth) m³
\(D_t\) Instantaneous decline rate (LGM), per day -
\(b_t\) Instantaneous b-factor (LGM) -

Method and standards

Duong and logistic growth decline models (time in days).

Where it is used

  • Shale and tight well forecasts.
  • EUR estimates for reserves.

Common mistakes

  • Fitting through early flow-back data.
  • Mixing time in months with constants fitted in days.

Assumptions and limits

  • Constant operating conditions; transient linear flow.

Questions and answers

Why not Arps for shale wells?

Shale wells stay in transient linear flow for years, giving Arps b-factors above 1 that predict unbounded recovery; Duong and the LGM are built for that flow regime.

What is K in the logistic growth model?

The carrying capacity: the cumulative production the well approaches as time goes to infinity, i.e. its EUR.

What do the defaults represent?

An illustrative case: Same fits at 5 years. Replace the inputs with your own data.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Ahmed, Reservoir Engineering Handbook, 5th ed. (Gulf Professional Publishing, 2019), ch. 18, eqs. 18-11 and 18-12, the logistic growth model and Examples 18-6 and 18-8 (Duong, 2011; Clark et al., 2011)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.