FireCADCalc

Horizontal Well Productivity: Borisov, Giger, Joshi, Renard–Dupuy

Steady-state productivity index and rate of a horizontal oil well by Borisov, Giger–Reiss–Jourdan, Joshi and Renard–Dupuy, with anisotropy and drainage ellipse.

Process steam and utilitiesRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: 1500 ft well in 30 ft of 20 mD pay, kh/kv = 5

Accepted: 0.0010132 to 10,132 mD
Accepted: 0.00010132 to 10,132 mD
Accepted: 1.6404 to 984.25 ft
Accepted: 32.808 to 16,404 ft
Accepted: 0.24711 to 24,711 acre
Accepted: 0.01 to 1,000 cP
Accepted: 1 to 3
Accepted: 0.098425 to 1.6404 ft
Accepted: 14.504 to 14,504 psi
Accepted: 14.504 to 14,504 psi

Results

Steady-state single-phase flow. The rate is taken from Joshi's method; the four methods usually agree within about 20 %.

Borisov's equation is for an isotropic reservoir and is evaluated with the horizontal permeability; the other three include k_h/k_v.

Drainage radius of the horizontal well1,053.2ft
Half major axis of the drainage ellipse (Joshi)1,194.0ft
Productivity index, Borisov (isotropic)1.7028bbl/(d·psi)
Productivity index, Giger–Reiss–Jourdan1.2184bbl/(d·psi)
Productivity index, Joshi1.3044bbl/(d·psi)
Productivity index, Renard–Dupuy1.5765bbl/(d·psi)
Oil rate by Joshi913.09bbl/d
Productivity index of a vertical well in the same area0.23066bbl/(d·psi)
Gain over the vertical well (Joshi)5.6551

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 1500 ft well in 30 ft of 20 mD pay, kh/kv = 5. The inputs, in the units selected above:

InputValue
Horizontal permeability20.000 mD
Vertical permeability4.0000 mD
Net pay thickness30.000 ft
Horizontal length of the well1,500.0 ft
Drainage area of the well80.000 acre
Oil viscosity2.0000 cP
Oil formation volume factor1.1500 -
Wellbore radius0.35000 ft
Pressure at the drainage boundary2,500.0 psi
Flowing bottom-hole pressure1,800.0 psi

Applying the formula below gives:

ResultValue
Drainage radius of the horizontal well1,053.2 ft
Half major axis of the drainage ellipse (Joshi)1,194.0 ft
Productivity index, Borisov (isotropic)1.7028 bbl/(d·psi)
Productivity index, Giger–Reiss–Jourdan1.2184 bbl/(d·psi)
Productivity index, Joshi1.3044 bbl/(d·psi)
Productivity index, Renard–Dupuy1.5765 bbl/(d·psi)
Oil rate by Joshi913.09 bbl/d
Productivity index of a vertical well in the same area0.23066 bbl/(d·psi)
Gain over the vertical well (Joshi)5.6551

Open this example in the calculator and change any input.

Formula

\(J_J = \frac{2\pi k_h h/(\mu_o B_o)}{\ln R + \frac{\beta^2 h}{L}\ln\frac{h}{2r_w}}, \quad R = \frac{a + \sqrt{a^2 - (L/2)^2}}{L/2}, \quad a = \frac{L}{2}\left[0.5 + \sqrt{0.25 + (2r_{eh}/L)^4}\right]^{1/2}, \quad \beta = \sqrt{k_h/k_v}\)

Variables

Symbol Meaning SI unit
\(k_h\) Horizontal permeability m²
\(k_v\) Vertical permeability m²
\(h\) Net pay thickness m
\(L\) Horizontal length of the well m
\(A\) Drainage area of the well m²
\(\mu_o\) Oil viscosity Pa·s
\(B_o\) Oil formation volume factor -
\(r_w\) Wellbore radius m
\(p_e\) Pressure at the drainage boundary Pa
\(p_{wf}\) Flowing bottom-hole pressure Pa
\(r_{eh}\) Drainage radius of the horizontal well m
\(a\) Half major axis of the drainage ellipse (Joshi) m
\(J_{Borisov}\) Productivity index, Borisov (isotropic) m³/(s·Pa)
\(J_{Giger}\) Productivity index, Giger–Reiss–Jourdan m³/(s·Pa)
\(J_{Joshi}\) Productivity index, Joshi m³/(s·Pa)
\(J_{RD}\) Productivity index, Renard–Dupuy m³/(s·Pa)
\(q_{oh}\) Oil rate by Joshi m³/s
\(J_v\) Productivity index of a vertical well in the same area m³/(s·Pa)
\(J_h/J_v\) Gain over the vertical well (Joshi) -

Method and standards

Steady-state horizontal-well inflow.

Where it is used

  • Comparing horizontal and vertical wells.
  • Sizing horizontal well length.

Common mistakes

  • Using the reservoir area instead of the well's drainage area.
  • Ignoring anisotropy.

Assumptions and limits

  • Steady state; single phase; well centred in the pay.

Questions and answers

Why do the four methods give different answers?

Each idealises the drainage shape differently (ellipse, cylinder or slab); for long wells in thin pay they converge, for short wells they spread.

What does vertical permeability do?

Low k_v makes the vertical flow into the wellbore harder and the productivity falls. Authors treat it differently: Giger and Joshi use β², Renard–Dupuy uses β.

What do the defaults represent?

An illustrative case: 1500 ft well in 30 ft of 20 mD pay, kh/kv = 5. Replace the inputs with your own data.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Ahmed, Reservoir Engineering Handbook, 5th ed. (Gulf Professional Publishing, 2019), ch. 7, eqs. 7-45 to 7-60 and Examples 7-13 and 7-14

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.