Worked example
Example: 40-acre five-spot, 25 ft of 120 mD sand. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Net thickness | 25.000 ft |
| Absolute permeability | 120.00 mD |
| Oil relative permeability at initial water saturation | 0.85000 - |
| Oil viscosity | 3.0000 cP |
| Distance between injector and producer | 933.00 ft |
| Wellbore radius | 0.35400 ft |
| Injection pressure minus producing bottom-hole pressure | 1,500.0 psi |
| Conductance ratio at the stage of the flood (1 at start) | 1.4000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Base (initial) injection rate | 622.04 bbl/d |
| Base injectivity | 0.41469 bbl/(d·psi) |
| Injection rate at the conductance ratio entered | 870.86 bbl/d |
Open this example in the calculator and change any input.
Formula
\(i_{base} = \frac{\pi hkk_{ro}\Delta p}{\mu_o\left[\ln(d/r_w) - 0.619\right]}\ \ \left(= \frac{0.003541hkk_{ro}\Delta p}{\mu_o[\ln(d/r_w) - 0.619]}\ \text{field}\right), \quad i_w = \gamma\,i_{base}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(h\) | Net thickness | m |
| \(k\) | Absolute permeability | m² |
| \(k_{ro}\) | Oil relative permeability at initial water saturation | - |
| \(\mu_o\) | Oil viscosity | Pa·s |
| \(d\) | Distance between injector and producer | m |
| \(r_w\) | Wellbore radius | m |
| \(\Delta p\) | Injection pressure minus producing bottom-hole pressure | Pa |
| \(\gamma\) | Conductance ratio at the stage of the flood (1 at start) | - |
| \(i_{base}\) | Base (initial) injection rate | m³/s |
| \(I_{base}\) | Base injectivity | m³/(s·Pa) |
| \(i_w\) | Injection rate at the conductance ratio entered | m³/s |
Method and standards
Muskat's five-spot injectivity.
Where it is used
- Waterflood injection planning.
- Sizing injection pumps.
Common mistakes
- Using the pattern side instead of the injector-producer distance.
- Ignoring free gas at the start of the flood.
Assumptions and limits
- Liquid-filled five-spot; steady state.
Questions and answers
What is the conductance ratio?
The injectivity at a stage of the flood divided by the initial injectivity; below 1 when water is less mobile than oil (M < 1), above 1 when it is more mobile.
Why ln(d/r_w) − 0.619?
It is Muskat's solution for the pressure drop between an injector and producer in an infinite repeated five-spot.
What do the defaults represent?
An illustrative case: 40-acre five-spot, 25 ft of 120 mD sand. Replace the inputs with your own data.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Ahmed, Reservoir Engineering Handbook, 5th ed. (Gulf Professional Publishing, 2019), ch. 14, eqs. 14-71 to 14-74 and Example 14-12 (Muskat, 1948; Caudle and Witte, 1959)