FireCADCalc

Pseudo-Steady-State Well Rate with Dietz Shape Factor

Oil well rate and productivity index at pseudo-steady state in a bounded drainage area of any shape (Dietz shape factor), and the pressure decline rate.

Process steam and utilitiesRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: 2:1 rectangle, C_A = 21.84, skin 3

Accepted: 0.00010132 to 101,320 mD
Accepted: 0.32808 to 1,640.4 ft
Accepted: 0.01 to 1,000 cP
Accepted: 1 to 3
Accepted: 1 to 50 %
Accepted: 6.895E-8 to 0.0068948 1/psi
Accepted: 0.24711 to 24,711 acre
Accepted: 0.01 to 40
Accepted: 0.098425 to 1.6404 ft
Accepted: -6 to 50
Accepted: 14.504 to 14,504 psi
Accepted: 14.504 to 14,504 psi

Results

Valid after the boundaries are felt (pseudo-steady state); for a circle C_A = 31.62 reduces it to the ln(r_e/r_w) − 0.75 form. Elongated or off-centre drainage areas have small C_A and lower productivity.

Oil rate (stock tank)428.32bbl/d
Productivity index0.42832bbl/(d·psi)
Rate of decline of the average pressure0.31150psi/h
Time to reach pseudo-steady state (t_DA = 0.1)190.31h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 2:1 rectangle, C_A = 21.84, skin 3. The inputs, in the units selected above:

InputValue
Permeability25.000 mD
Net pay thickness40.000 ft
Oil viscosity1.2000 cP
Oil formation volume factor1.3000 -
Porosity20.000 %
Total compressibility1.5000e-05 1/psi
Drainage area80.000 acre
Dietz shape factor (circle 31.62, square 30.88)21.837 -
Wellbore radius0.30000 ft
Skin factor3.0000 -
Average reservoir pressure2,800.0 psi
Flowing bottom-hole pressure1,800.0 psi

Applying the formula below gives:

ResultValue
Oil rate (stock tank)428.32 bbl/d
Productivity index0.42832 bbl/(d·psi)
Rate of decline of the average pressure0.31150 psi/h
Time to reach pseudo-steady state (t_DA = 0.1)190.31 h

Open this example in the calculator and change any input.

Formula

\(Q_o = \frac{2\pi kh(\bar p - p_{wf})}{\mu B_o\left[\tfrac12\ln\frac{4A}{\gamma C_Ar_w^2} + s\right]}, \quad \frac{d\bar p}{dt} = \frac{Q_oB_o}{Ah\phi c_t}, \quad \gamma = 1.781\)

Variables

Symbol Meaning SI unit
\(k\) Permeability m²
\(h\) Net pay thickness m
\(\mu_o\) Oil viscosity Pa·s
\(B_o\) Oil formation volume factor -
\(\phi\) Porosity -
\(c_t\) Total compressibility 1/Pa
\(A\) Drainage area m²
\(C_A\) Dietz shape factor (circle 31.62, square 30.88) -
\(r_w\) Wellbore radius m
\(s\) Skin factor -
\(\bar p\) Average reservoir pressure Pa
\(p_{wf}\) Flowing bottom-hole pressure Pa
\(Q_o\) Oil rate (stock tank) m³/s
\(J\) Productivity index m³/(s·Pa)
\(d\bar p/dt\) Rate of decline of the average pressure Pa/s
\(t_{pss}\) Time to reach pseudo-steady state (t_DA = 0.1) s

Method and standards

Pseudo-steady-state flow in bounded drainage areas.

Where it is used

  • Well spacing and placement.
  • Rate forecasts in developed fields.

Common mistakes

  • Using a circle's factor for a long rectangle.
  • Applying it during transient flow.

Assumptions and limits

  • Single-phase, slightly compressible oil; constant rate.

Questions and answers

What is the Dietz shape factor?

A number that captures how the drainage shape and well position affect the pressure loss; 31.6 for a well centred in a circle, much less for a well near an edge.

Why does the average pressure fall linearly?

In pseudo-steady state the whole drainage volume depletes uniformly; the decline rate is the withdrawal divided by the pore volume times compressibility.

What do the defaults represent?

An illustrative case: 2:1 rectangle, C_A = 21.84, skin 3. Replace the inputs with your own data.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Ahmed, Reservoir Engineering Handbook, 5th ed. (Gulf Professional Publishing, 2019), ch. 6, eqs. 6-136 to 6-138 and Examples 6-17 and 6-18 (Dietz, 1965)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.