Worked example
Example: Forecast above the bubble point. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Average reservoir pressure | 4,200.0 psi |
| Bubble-point pressure | 1,800.0 psi |
| Stabilised test rate | 900.00 bbl/d |
| Test bottom-hole pressure | 3,300.0 psi |
| Bottom-hole pressure for the forecast | 2,500.0 psi |
Applying the formula below gives:
| Result | Value |
|---|---|
| Productivity index above the bubble point | 1.0000 bbl/(d·psi) |
| Rate at the bubble point | 2,400.0 bbl/d |
| Maximum rate (AOF) | 3,400.0 bbl/d |
| Rate at the forecast pressure | 1,700.0 bbl/d |
Open this example in the calculator and change any input.
Formula
\(Q_o = J(\bar p_r - p_{wf})\ (p_{wf} \ge p_b), \quad Q_o = Q_{ob} + \frac{Jp_b}{1.8}\left[1 - 0.2\frac{p_{wf}}{p_b} - 0.8\left(\frac{p_{wf}}{p_b}\right)^2\right]\ (p_{wf} < p_b)\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\bar p_r\) | Average reservoir pressure | Pa |
| \(p_b\) | Bubble-point pressure | Pa |
| \(Q_{test}\) | Stabilised test rate | m³/s |
| \(p_{wf,test}\) | Test bottom-hole pressure | Pa |
| \(p_{wf}\) | Bottom-hole pressure for the forecast | Pa |
| \(J\) | Productivity index above the bubble point | m³/(s·Pa) |
| \(Q_{ob}\) | Rate at the bubble point | m³/s |
| \(Q_{o,max}\) | Maximum rate (AOF) | m³/s |
| \(Q_o\) | Rate at the forecast pressure | m³/s |
Method and standards
Generalised (composite) Vogel IPR.
Where it is used
- Artificial lift and tubing design.
- Production forecasts.
Common mistakes
- Using plain Vogel above the bubble point.
- Using a test that had not stabilised.
Assumptions and limits
- Undersaturated reservoir; zero skin.
Questions and answers
Why the factor 1.8?
It makes the Vogel curve below p_b continue the straight line's slope at the bubble point, so the IPR has no kink.
What if my test is below the bubble point?
J is solved from the combined equation; the calculator chooses the case from the test pressure.
What do the defaults represent?
An illustrative case: Forecast above the bubble point. Replace the inputs with your own data.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Ahmed, Reservoir Engineering Handbook, 5th ed. (Gulf Professional Publishing, 2019), ch. 7, eqs. 7-10 to 7-12 and Examples 7-3 and 7-4