FireCADCalc

Composite IPR for an Undersaturated Oil Well (Vogel Below p_b)

Productivity index, rate at the bubble point, maximum rate and rate at a chosen pressure for an undersaturated reservoir: straight line above p_b, Vogel below.

Process steam and utilitiesRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: Forecast above the bubble point

Accepted: 14.504 to 14,504 psi
Accepted: 14.504 to 14,504 psi
Accepted: 0.54344 to 543,440 bbl/d
Accepted: 0 to 14,504 psi
Accepted: 0 to 14,504 psi

Results

Above the bubble point inflow is linear (constant J); below it free gas reduces the oil mobility and Vogel's curve applies, joined smoothly at p_b. The test may be taken above or below the bubble point.

Productivity index above the bubble point1.0000bbl/(d·psi)
Rate at the bubble point2,400.0bbl/d
Maximum rate (AOF)3,400.0bbl/d
Rate at the forecast pressure1,700.0bbl/d

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Forecast above the bubble point. The inputs, in the units selected above:

InputValue
Average reservoir pressure4,200.0 psi
Bubble-point pressure1,800.0 psi
Stabilised test rate900.00 bbl/d
Test bottom-hole pressure3,300.0 psi
Bottom-hole pressure for the forecast2,500.0 psi

Applying the formula below gives:

ResultValue
Productivity index above the bubble point1.0000 bbl/(d·psi)
Rate at the bubble point2,400.0 bbl/d
Maximum rate (AOF)3,400.0 bbl/d
Rate at the forecast pressure1,700.0 bbl/d

Open this example in the calculator and change any input.

Formula

\(Q_o = J(\bar p_r - p_{wf})\ (p_{wf} \ge p_b), \quad Q_o = Q_{ob} + \frac{Jp_b}{1.8}\left[1 - 0.2\frac{p_{wf}}{p_b} - 0.8\left(\frac{p_{wf}}{p_b}\right)^2\right]\ (p_{wf} < p_b)\)

Variables

Symbol Meaning SI unit
\(\bar p_r\) Average reservoir pressure Pa
\(p_b\) Bubble-point pressure Pa
\(Q_{test}\) Stabilised test rate m³/s
\(p_{wf,test}\) Test bottom-hole pressure Pa
\(p_{wf}\) Bottom-hole pressure for the forecast Pa
\(J\) Productivity index above the bubble point m³/(s·Pa)
\(Q_{ob}\) Rate at the bubble point m³/s
\(Q_{o,max}\) Maximum rate (AOF) m³/s
\(Q_o\) Rate at the forecast pressure m³/s

Method and standards

Generalised (composite) Vogel IPR.

Where it is used

  • Artificial lift and tubing design.
  • Production forecasts.

Common mistakes

  • Using plain Vogel above the bubble point.
  • Using a test that had not stabilised.

Assumptions and limits

  • Undersaturated reservoir; zero skin.

Questions and answers

Why the factor 1.8?

It makes the Vogel curve below p_b continue the straight line's slope at the bubble point, so the IPR has no kink.

What if my test is below the bubble point?

J is solved from the combined equation; the calculator chooses the case from the test pressure.

What do the defaults represent?

An illustrative case: Forecast above the bubble point. Replace the inputs with your own data.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Ahmed, Reservoir Engineering Handbook, 5th ed. (Gulf Professional Publishing, 2019), ch. 7, eqs. 7-10 to 7-12 and Examples 7-3 and 7-4

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.