FireCADCalc

Oil Compressibility Below the Bubble Point (McCain, Standing)

Apparent oil compressibility below the bubble point including gas liberation, by McCain's correlation and by differentiating Standing's Rs and Bo.

Process steam and utilitiesRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: Black oil at 1000 psiaVolatile oil at 3000 psia

Accepted: 14.504 to 14,504 psi
Accepted: 14.504 to 14,504 psi
Accepted: 44.33 to 350.33 °F
Accepted: 10 to 60
Accepted: 5.6146 to 5,614.6 scf/STB
Accepted: 0 to 5,614.6 scf/STB
Accepted: 1 to 4
Accepted: 1.781E-6 to 0.17811 bbl/scf
Accepted: 0.55 to 1.5

Results

Below the bubble point the apparent compressibility includes the gas coming out of solution, so it is ten or more times the liquid compressibility. Check consistency: ∂B_o/∂p must be smaller than B_g·∂R_s/∂p or c_o turns negative.

Oil compressibility (McCain, with p_b)4.5190e-041/psi
Oil compressibility (Standing derivatives)7.3134e-041/psi
Rate of gas liberation (Standing)0.38744
Slope of B_o (Standing), per psi1.9259e-04

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Black oil at 1000 psia. The inputs, in the units selected above:

InputValue
Pressure (below the bubble point)1,000.00 psi
Bubble-point pressure2,500.0 psi
Temperature200.00 °F
Oil gravity35.000 -
Solution GOR at the bubble point600.00 scf/STB
Solution GOR at the pressure330.00 scf/STB
Oil formation volume factor at the pressure1.2200 -
Gas formation volume factor at the pressure0.002800 bbl/scf
Gas gravity (air = 1)0.80000 -

Applying the formula below gives:

ResultValue
Oil compressibility (McCain, with p_b)4.5190e-04 1/psi
Oil compressibility (Standing derivatives)7.3134e-04 1/psi
Rate of gas liberation (Standing)0.38744
Slope of B_o (Standing), per psi1.9259e-04

Open this example in the calculator and change any input.

Formula

\(c_o = e^A,\ A = -7.573 - 1.45\ln p - 0.383\ln p_b + 1.402\ln T + 0.256\ln API + 0.449\ln R_{sb}, \quad c_o = -\frac{1}{B_o}\left(\frac{\partial B_o}{\partial p} - B_g\frac{\partial R_s}{\partial p}\right)\)

Variables

Symbol Meaning SI unit
\(p\) Pressure (below the bubble point) Pa
\(p_b\) Bubble-point pressure Pa
\(T\) Temperature K
\(API\) Oil gravity -
\(R_{sb}\) Solution GOR at the bubble point m³/m³
\(R_s\) Solution GOR at the pressure m³/m³
\(B_o\) Oil formation volume factor at the pressure -
\(B_g\) Gas formation volume factor at the pressure m³/m³
\(\gamma_g\) Gas gravity (air = 1) -
\(c_{o,McCain}\) Oil compressibility (McCain, with p_b) 1/Pa
\(c_{o,Standing}\) Oil compressibility (Standing derivatives) 1/Pa
\(\partial R_s/\partial p\) Rate of gas liberation (Standing) -
\(\partial B_o/\partial p\) Slope of B_o (Standing), per psi -

Method and standards

McCain correlation and Standing derivatives (psia, °R, °F).

Where it is used

  • Material balance below the bubble point.
  • Well test analysis in saturated reservoirs.

Common mistakes

  • Using liquid c_o below p_b.
  • Mixing ft³/scf and bbl/scf for B_g.

Assumptions and limits

  • Black oil below the bubble point.

Questions and answers

Why is c_o so large below the bubble point?

A pressure drop frees gas, and that gas occupies far more volume than the oil shrinks; the apparent compressibility counts both.

Which should I use?

McCain's correlation needs only p, p_b, T, API and R_sb; Standing's derivative form uses your own B_o, R_s and B_g at the pressure.

What do the defaults represent?

An illustrative case: Black oil at 1000 psia. Replace the inputs with your own data.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Ahmed, Reservoir Engineering Handbook, 5th ed. (Gulf Professional Publishing, 2019), ch. 2, eqs. 2-96 and 2-99 to 2-105 and Example 2-32 (McCain et al., 1988; Standing)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.