Safety Valve Capacity Share: Drum and Superheater

Share of required relieving capacity given by superheater and drum safety valves, checked against a minimum superheater share you enter.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationDistillery and ethanolBoiler

Inputs

Examples: 100 t/h boilerShort of capacity

Results

Total installed capacity110.00t/h
Capacity over requirement110.00%
Superheater share of the required capacity25.000%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 100 t/h boiler. The inputs, in the units selected above:

InputValue
Required relieving capacity (usually MCR)100.00 t/h
Superheater valves' rated capacity25.000 t/h
Drum valves' rated capacity85.000 t/h
Minimum superheater share required (from your code)20.000 %

Applying the formula below gives:

ResultValue
Total installed capacity110.00 t/h
Capacity over requirement110.00 %
Superheater share of the required capacity25.000 %

Open this example in the calculator and change any input.

Formula

\(s_{SH} = \frac{\dot m_{SH}}{\dot m_r}, \quad \frac{\dot m_{SH} + \dot m_D}{\dot m_r} \ge 1\)

Variables

Symbol Meaning SI unit
\(\dot m_r\) Required relieving capacity (usually MCR) kg/s
\(\dot m_{SH}\) Superheater valves' rated capacity kg/s
\(\dot m_D\) Drum valves' rated capacity kg/s
\(s_{min}\) Minimum superheater share required (from your code) -
\(\dot m_t\) Total installed capacity kg/s
\(\dot m_t/\dot m_r\) Capacity over requirement -
\(s_{SH}\) Superheater share of the required capacity -

Method and standards

Capacity accounting: the superheater share is the superheater valves' rated capacity over the required relieving capacity, and the total installed capacity is compared with the requirement. Boiler codes differ in how they state the superheater requirement (as a share of the required capacity, of the total valve capacity, or as a share the drum valves alone must meet): enter the minimum on the same definition, or convert it.

Where it is used

  • Safety valve audits.
  • Inspection preparation.

Common mistakes

  • Using set pressure capacities at a different pressure.

Assumptions and limits

  • Rated capacities at the same conditions.
  • Set pressures are not inputs: the calculator does not check that the superheater valves are set to lift before the drum valves. Check that against your code and the valve set pressures.

References

  • Capacity accounting (definitions); valve sizing
  • set pressures and the minimum shares are code matters entered by the user

Questions and answers

Why must superheater valves lift first?

So steam keeps flowing through the superheater and cools its tubes while relieving.

Where do the numbers come from?

Rated capacities on the valve nameplates or certificates; minimum shares from your boiler code.

Does this size valves?

No: sizing is a code calculation, deliberately not reproduced here.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.