Massecuite temperature with time in an air-cooled U-trough crystalliser (Hugot eqns 34.6–34.13), its surface/volume ratio and the time to a target temperature.

Sugar mill and cogeneration

Inputs

Examples: Hugot example: 70 -> air 30, D 1.8, m 3.33Smaller trough

Results

Hugot's example: 70 °C massecuite in air at 30 °C, D = 1.8 m, m = 3.33 follows T = 30 + 40e^(−0.027t), t in hours.

The massecuite cools at 1.5 °C/h at the start, faster than the about 1 °C/h Hugot recommends against false grain.

Cooling surface / volume3.75001/m
Massecuite temperature after the time50.958°C
Time to the target temperature28.311h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Hugot example: 70 -> air 30, D 1.8, m 3.33. The inputs, in the units selected above:

InputValue
Massecuite temperature at the start70.000 °C
Air temperature30.000 °C
Crystalliser width (diameter)1.8000 m
Length / width3.3300 -
Heat-transfer coefficient to air8.1410 W/(m²·K)
Massecuite specific heat1.8422 kJ/(kg·K)
Massecuite density1,500.0 kg/m³
Time24.000 h
Target temperature45.000 °C

Applying the formula below gives:

ResultValue
Cooling surface / volume2.5559 1/m
Massecuite temperature after the time50.870 °C
Time to the target temperature36.182 h

Open this example in the calculator and change any input.

Formula

\(\frac{S}{V} = \frac{2(1 + 2m)}{mD}, \quad T = \theta + (T_0 - \theta)\exp\left(-\frac{k}{d_m c}\frac{S}{V}t\right)\)

Variables

Symbol Meaning SI unit
\(T_0\) Massecuite temperature at the start K
\(\theta\) Air temperature K
\(D\) Crystalliser width (diameter) m
\(m\) Length / width -
\(k\) Heat-transfer coefficient to air W/(m²·K)
\(c\) Massecuite specific heat J/(kg·K)
\(d_m\) Massecuite density kg/m³
\(t\) Time s
\(T^*\) Target temperature K
\(S/V\) Cooling surface / volume (per m) 1/m
\(T\) Massecuite temperature after the time K
\(t^*\) Time to the target temperature s

Method and standards

Hugot's lumped cooling model of a U-trough.

Where it is used

  • Estimating cooling time.
  • Judging whether water cooling is needed.

Common mistakes

  • Using hot massecuite density for cold.
  • Forgetting the ends in S/V for short troughs.

Assumptions and limits

  • Well-mixed massecuite; constant coefficient.
  • If the target temperature is not between the air and starting temperatures, the time to it is left out with a note; a note also appears when the starting cooling rate exceeds about 1 °C/h.

References

  • Hugot
  • Handbook of Cane Sugar Engineering
  • 3rd ed. (Elsevier, 1986)
  • ch. 34
  • cooling in air-cooled crystallisers
  • eqns 34.6–34.13
  • pp. 729–731

Questions and answers

Why so slow?

The surface per volume of a large trough is small and the coefficient to air low (Hugot about 7 kcal/(m²·h·°C)).

What limits cooling rate?

Too fast cooling raises supersaturation and forms false grain; Hugot keeps it to about 1 °C/h.

Why water cooling?

To shorten the time: water-cooled units reach 40 °C in 12–20 h.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.