Rectifier Vapour, Condenser Duty and Cooling Water

Overhead vapour, condenser duty and cooling-water flow of a rectifying column from the distillate rate, the reflux ratio and the latent heat of the overhead.

Distillery and ethanol

Inputs

Examples: 3.3 t/h distillate, R 3.5Low reflux

Near 0.9–1.0 MJ/kg for vapour near the ethanol–water azeotrope.

Results

In multi-pressure plants this heat reboils a lower-pressure column instead of going to cooling water.

Overhead vapour14,850kg/h
Condenser duty3,918.8kW
Cooling water421.19t/h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 3.3 t/h distillate, R 3.5. The inputs, in the units selected above:

InputValue
Distillate (product draw)3,300.0 kg/h
Reflux ratio L/D3.5000 -
Latent heat of the overhead vapour950.00 kJ/kg
Cooling-water rise8.0000 K

Applying the formula below gives:

ResultValue
Overhead vapour14,850 kg/h
Condenser duty3,918.8 kW
Cooling water421.19 t/h

Open this example in the calculator and change any input.

Formula

\(V = D (R + 1), \quad \dot Q_c = V \lambda, \quad \dot m_w = \frac{\dot Q_c}{c_w \Delta T_w}\)

Variables

Symbol Meaning SI unit
\(D\) Distillate (product draw) kg/s
\(R\) Reflux ratio L/D -
\(\lambda\) Latent heat of the overhead vapour J/kg
\(\Delta T_w\) Cooling-water rise K
\(V\) Overhead vapour kg/s
\(\dot Q_c\) Condenser duty W
\(\dot m_w\) Cooling water kg/s
\(c_w\) Cooling-water specific heat, 4 186.8 J/(kg·K)

Method and standards

Balance.

Where it is used

  • Column condenser sizing.
  • Energy integration studies.

Common mistakes

  • Reflux ratio as L/V.

Assumptions and limits

  • Total condenser.

References

  • Overhead balance V = D (R + 1); Q = V λ (McCabe–Thiele constant molal overflow)

Questions and answers

Why does reflux cost so much?

Every kg of reflux is vapour that was boiled and must be condensed.

Latent heat of ethanol–water vapour?

Between pure ethanol (about 0.85 MJ/kg) and water (2.26 MJ/kg); near the azeotrope about 0.9–1.0.

Reboiler duty?

Roughly the condenser duty plus heat to bring feed to its boiling point.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.