Medium Transmission Line: Nominal-π Model

Sending-end voltage, current, power factor, regulation and efficiency of a medium-length line by the nominal-π model with half the line capacitance at each end.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationChemical and fertiliserPulp and paperFood, dairy and textile

Inputs

Examples: 132 kV, 50 MW at 0.85220 kV, 150 MW at 0.9

Results

Nominal-π: valid for about 80–250 km. Regulation uses the no-load receiving voltage V_S/|1 − XB/2|, with the exact |A| = |1 + YZ/2| (Ferranti rise).

Sending-end line voltage149.10kV
Sending-end current242.13A
Sending-end power factor0.84477
Voltage regulation13.951%
Efficiency94.654%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 132 kV, 50 MW at 0.85. The inputs, in the units selected above:

InputValue
Receiving-end line voltage132.00 kV
Load power50.000 MW
Load power factor (lagging)85.000 %
Total resistance per phase15.000 Ω
Total reactance per phase50.000 Ω
Total shunt susceptance per phase, in siemens3.5000e-04 -

Applying the formula below gives:

ResultValue
Sending-end line voltage149.10 kV
Sending-end current242.13 A
Sending-end power factor0.84477
Voltage regulation13.951 %
Efficiency94.654 %

Open this example in the calculator and change any input.

Formula

\(\vec I_L = \vec I_R + j\frac B2\vec V_R, \quad \vec V_S = \vec V_R + \vec I_L(R + jX), \quad \vec I_S = \vec I_L + j\frac B2\vec V_S\)

Variables

Symbol Meaning SI unit
\(V_R\) Receiving-end line voltage V
\(P\) Load power W
\(\cos\phi\) Load power factor (lagging) -
\(R\) Total resistance per phase Ω
\(X\) Total reactance per phase Ω
\(B\) Total shunt susceptance per phase (S) -
\(V_S\) Sending-end line voltage V
\(I_S\) Sending-end current A
\(\cos\phi_S\) Sending-end power factor -
\(\text{Reg}\) Voltage regulation -
\(\eta\) Efficiency -

Method and standards

Nominal-π equations.

Where it is used

  • Utility interconnections.
  • Long plant tie-lines.

Common mistakes

  • Using per-km values as totals.
  • Line instead of phase voltages.

Assumptions and limits

  • Balanced; lumped parameters. The no-load receiving voltage is V_S/|A| with A = 1 + YZ/2 = 1 − XB/2 + jRB/2.
  • B is entered in siemens in every unit system.

References

  • Stevenson and Grainger
  • Power System Analysis (McGraw-Hill, 1994); Kothari and Nagrath
  • Modern Power System Analysis
  • 4th ed. (2011) (medium line, nominal-π)

Questions and answers

Why include capacitance?

On longer lines, charging current is a real share of the load current and changes the sending-end power factor and voltage.

Why can regulation look small at light load?

Line charging raises receiving voltage (Ferranti effect), offsetting the series drop.

What do the defaults represent?

A 132 kV line carrying 50 MW at 0.85 power factor with 15 + j50 Ω and 350 µS total.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.