Worked example
Example: Illustrative: 3 ns edge on a 200 MHz scope, 3 % error. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Instrument (scope and probe) bandwidth | 200.00 MHz |
| True rise time of the signal | 3.0000 ns |
| Rise time–bandwidth constant (0.35 single pole, up to 0.45 sharp roll-off) | 0.35000 - |
| Allowed rise-time measurement error | 3.0000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Instrument rise time k/BW | 1.7500 ns |
| Displayed rise time √(t_sig² + t_inst²) | 3.4731 ns |
| Rise-time error | 15.770 % |
| Bandwidth for the allowed error | 472.76 MHz |
| Knee frequency of the edge 0.5/t_r | 166.67 MHz |
Open this example in the calculator and change any input.
Formula
\(t_r = \frac{k}{BW}\ (k \approx 0.35), \quad t_{r,meas} = \sqrt{t_{r,sig}^2 + t_{r,inst}^2}, \quad f_{knee} = \frac{0.5}{t_r}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(BW\) | Instrument (scope and probe) bandwidth | 1/s |
| \(t_{r,sig}\) | True rise time of the signal | s |
| \(k\) | Rise time–bandwidth constant (0.35 single pole, up to 0.45 sharp roll-off) | - |
| \(\varepsilon\) | Allowed rise-time measurement error | - |
| \(t_{r,inst}\) | Instrument rise time k/BW | s |
| \(t_{r,meas}\) | Displayed rise time √(t_sig² + t_inst²) | s |
| \(\varepsilon_{meas}\) | Rise-time error | - |
| \(BW_{needed}\) | Bandwidth for the allowed error | 1/s |
| \(f_{knee}\) | Knee frequency of the edge 0.5/t_r | 1/s |
Method and standards
Bandwidth–rise-time relations.
Where it is used
- Choosing oscilloscopes and probes.
- Signal integrity and high-speed digital design.
Common mistakes
- Assuming the scope shows the true edge.
- Ignoring the probe bandwidth.
Assumptions and limits
- Gaussian-like responses adding in quadrature.
References
- Rise time–bandwidth relation and quadrature addition
Questions and answers
How much bandwidth does my scope need?
For about 3 % rise-time error the instrument must be roughly four times faster than the signal edge; the 'five times the clock' rule is a rough version of the same idea.
Where does 0.35 come from?
For a single-pole low-pass, the 10–90 % rise time is ln 9/(2π f₋₃dB) ≈ 0.35/f₋₃dB.
What do the defaults represent?
An illustrative 3 ns edge viewed on a 200 MHz scope and probe, aiming for 3 % error.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Horowitz and Hill, The Art of Electronics, 3rd ed. (Cambridge University Press, 2015), ch. 1