FireCADCalc

Three-Product Formula: Mass Split from Two Metal Assays

Mass split of a feed into two concentrates and a tailing from the assays of two metals on all four streams, with the recovery of each metal to its concentrate.

Inputs

Examples: Lead-zinc plant: Pb and Zn concentrates and tailingsCopper-zinc plantIron ore: magnetic and gravity concentrates (Fe and SiO2)

Results

Exact solution of the three balances; with more assays than unknowns, reconcile the data by least squares instead. The split is sensitive to assay errors when the two metals separate in a similar way.

Concentrate 1 yield7.0000%
Concentrate 2 yield13.000%
Tailings yield80.000%
Concentrate 1 rate8.4000t/h
Concentrate 2 rate15.600t/h
Tailings rate96.000t/h
Recovery of metal A to concentrate 187.866%
Recovery of metal B to concentrate 288.251%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Lead-zinc plant: Pb and Zn concentrates and tailings. The inputs, in the units selected above:

InputValue
Feed rate (dry solids)120.00 t/h
Metal A in the feed4.7800 %
Metal A in concentrate 160.000 %
Metal A in concentrate 22.0000 %
Metal A in the tailings0.40000 %
Metal B in the feed7.6600 %
Metal B in concentrate 16.0000 %
Metal B in concentrate 252.000 %
Metal B in the tailings0.60000 %

Applying the formula below gives:

ResultValue
Concentrate 1 yield7.0000 %
Concentrate 2 yield13.000 %
Tailings yield80.000 %
Concentrate 1 rate8.4000 t/h
Concentrate 2 rate15.600 t/h
Tailings rate96.000 t/h
Recovery of metal A to concentrate 187.866 %
Recovery of metal B to concentrate 288.251 %

Open this example in the calculator and change any input.

Formula

\(W_1 + W_2 + W_3 = F, \quad W_1 a_1 + W_2 a_2 + W_3 a_3 = F a_f, \quad W_1 b_1 + W_2 b_2 + W_3 b_3 = F b_f\)

Variables

Symbol Meaning SI unit
\(F\) Feed rate (dry solids) kg/s
\(a_f\) Metal A in the feed -
\(a_1\) Metal A in concentrate 1 -
\(a_2\) Metal A in concentrate 2 -
\(a_3\) Metal A in the tailings -
\(b_f\) Metal B in the feed -
\(b_1\) Metal B in concentrate 1 -
\(b_2\) Metal B in concentrate 2 -
\(b_3\) Metal B in the tailings -
\(W_1/F\) Concentrate 1 yield -
\(W_2/F\) Concentrate 2 yield -
\(W_3/F\) Tailings yield -
\(W_1\) Concentrate 1 rate kg/s
\(W_2\) Concentrate 2 rate kg/s
\(W_3\) Tailings rate kg/s
\(R_{A1}\) Recovery of metal A to concentrate 1 -
\(R_{B2}\) Recovery of metal B to concentrate 2 -

Method and standards

n-product formula for three products.

Where it is used

  • Lead-zinc and copper-zinc differential flotation.
  • Iron ore plants with two concentrates.

Common mistakes

  • Using two metals that report together.
  • Ignoring a fourth product stream.

Assumptions and limits

  • Steady state; exact assays.

References

  • Wills and Finch
  • Wills' Mineral Processing Technology
  • 8th ed. (Butterworth-Heinemann, 2016)
  • ch. 3
  • eqs. 3.28-3.29 and Table 3.1 (n-product formula)

Questions and answers

How many assays are needed?

For n products you need n − 1 metals assayed on every stream: two metals for a feed, two concentrates and a tailing.

Why can the answer be negative?

Assay errors or a metal that does not separate make the balance ill-conditioned; the feed must lie inside the triangle of the three products.

What do the defaults represent?

A lead-zinc plant at 120 t/h: lead concentrate 60 % Pb, zinc concentrate 52 % Zn, tailings 0.4 % Pb and 0.6 % Zn.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.