FireCADCalc

SAG Mill Specific Energy from the SAG Grindability Index

SAG mill specific energy from the SGI or SPI test time and the transfer size, with Amelunxen's published constants and the pebble-crusher factor.

Inputs

Examples: SGI 100 min, T80 1,700 µm, no pebble crusherHard ore with pebble crushingSoft ore, fine transfer size

Results

K = 5.9 and n = 0.55 are Amelunxen et al. (2014), calibrated mostly on porphyry ores of the Americas; the proprietary SPI equation uses its own constants. Use for variability and early design, not final sizing.

SAG specific energy7.1390kWh/t
SAG mill power6,425.1kW
Circuit factor used1.0000

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: SGI 100 min, T80 1,700 µm, no pebble crusher. The inputs, in the units selected above:

InputValue
SGI test time to 80 % passing 1.7 mm100.00 min
Transfer size (SAG circuit product, 80 % passing)1,700.0 µm
Constant K5.9000 -
Exponent n0.55000 -
CircuitWithout pebble crusher (f = 1.0)
Throughput1,500.0 t/h

Applying the formula below gives:

ResultValue
SAG specific energy9.6046 kWh/t
SAG mill power14,407 kW
Circuit factor used1.0000

Open this example in the calculator and change any input.

Formula

\(E_{SAG} = K\left(\frac{M}{\sqrt{P_{80}}}\right)^n f_{SAG}\)

Variables

Symbol Meaning SI unit
\(M\) SGI test time to 80 % passing 1.7 mm s
\(P_{80}\) Transfer size (SAG circuit product, 80 % passing) m
\(K\) Constant K -
\(n\) Exponent n -
\(f_{SAG}\) Circuit -
\(T\) Throughput kg/s
\(E_{SAG}\) SAG specific energy J/kg
\(P\) SAG mill power W

Method and standards

SGI energy equation.

Where it is used

  • Geometallurgical throughput models.
  • Comparing ore domains for a SAG circuit.

Common mistakes

  • Entering the time in seconds.
  • Using the ball-mill product size.

Assumptions and limits

  • Amelunxen calibration.

References

  • Wills and Finch
  • Wills' Mineral Processing Technology
  • 8th ed. (Butterworth-Heinemann, 2016)
  • ch. 5
  • eq. 5.10 (Starkey and Dobby, 1996; Amelunxen et al., 2014)

Questions and answers

What is the transfer size?

The 80 % passing size of the SAG circuit product sent to the ball mills, in micrometres.

Why the pebble-crusher factor?

Crushing the critical-size pebbles removes the hardest-to-grind fraction from the SAG mill, saving about 15 % of energy.

What do the defaults represent?

An ore that takes 100 minutes in the SGI test, ground to a 1,700 µm transfer size without a pebble crusher, at 1,500 t/h.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.