SAG Mill Charge Apparent Density

Apparent density of a SAG, AG or ball mill charge of balls, rock, voids and slurry, and the charge mass for a mill volume, from the fillings and densities.

Inputs

Examples: Wills Example 7.1a: SAG, 10 % balls and 30 % rockWills Example 7.1b: rock replaced by steelAG mill, voids part filled

Results

Power draw is roughly proportional to the apparent density at the same filling and speed, so replacing rock with balls raises power (Wills Example 7.1b). The charge mass is the balls, rock and slurry in the voids.

Slurry density1.2000g/cm³
Apparent density of the charge3.0075g/cm³
Charge mass (balls, rock and slurry)721.80t

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Wills Example 7.1a: SAG, 10 % balls and 30 % rock. The inputs, in the units selected above:

InputValue
Ball filling (fraction of mill volume)10.000 %
Rock filling30.000 %
Voidage of the charge40.000 %
Fraction of voids filled by slurry100.00 %
Ball density7.8500 g/cm³
Ore density3.0000 g/cm³
Solids by volume in the slurry10.000 %
Density of the slurry solids3.0000 g/cm³
Mill internal volume600.00 m³

Applying the formula below gives:

ResultValue
Slurry density1.2000 g/cm³
Apparent density of the charge3.0075 g/cm³
Charge mass (balls, rock and slurry)721.80 t

Open this example in the calculator and change any input.

Formula

\(\rho_{ap} = \frac{J_b(1 - f_v)\rho_b + J_r(1 - f_v)\rho_r + (J_b + J_r)f_v U\rho_{sl}}{J_b(1 - f_v) + J_r(1 - f_v) + (J_b + J_r)f_v U}, \quad \rho_{sl} = \phi_p\rho_p + (1 - \phi_p)\)

Variables

Symbol Meaning SI unit
\(J_b\) Ball filling (fraction of mill volume) -
\(J_r\) Rock filling -
\(f_v\) Voidage of the charge -
\(U\) Fraction of voids filled by slurry -
\(\rho_b\) Ball density kg/m³
\(\rho_r\) Ore density kg/m³
\(\phi_p\) Solids by volume in the slurry -
\(\rho_p\) Density of the slurry solids kg/m³
\(V\) Mill internal volume m³
\(\rho_{sl}\) Slurry density kg/m³
\(\rho_{ap}\) Apparent density of the charge kg/m³
\(M_c\) Charge mass (balls, rock and slurry) kg

Method and standards

Volume-weighted charge density.

Where it is used

  • Mill power models and load monitoring.
  • Bearing pressure and ball top-up planning.

Common mistakes

  • Mixing total and ball filling.
  • Ignoring slurry in the voids.

Assumptions and limits

  • Same voidage for balls and rock.

References

  • Wills and Finch
  • Wills' Mineral Processing Technology
  • 8th ed. (Butterworth-Heinemann, 2016)
  • ch. 7
  • eqs. 7.8-7.9 and Example 7.1

Questions and answers

Why does SAG power fall when rock replaces balls?

Rock is less than half as dense as steel, so the charge is lighter at the same volume; Wills's example drops from 5.19 to 3.0 t/m³.

What void filling should I use?

1.0 when slurry fills the voids of the charge; less when the mill runs with a low slurry level.

What do the defaults represent?

Wills's Example 7.1a: 10 % balls and 30 % rock, 40 % voidage filled with slurry of 10 % solids by volume (3.0 t/m³), in a 600 m³ mill.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.