Worked example
Example: Four beds 4, 6, 2, 5 ft at 150, 60, 400, 25 mD. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Layer 1 thickness (0 if unused) | 4.0000 ft |
| Layer 1 permeability | 150.00 mD |
| Layer 2 thickness (0 if unused) | 6.0000 ft |
| Layer 2 permeability | 60.000 mD |
| Layer 3 thickness (0 if unused) | 2.0000 ft |
| Layer 3 permeability | 400.00 mD |
| Layer 4 thickness (0 if unused) | 5.0000 ft |
| Layer 4 permeability | 25.000 mD |
| Layer 5 thickness (0 if unused) | 0 ft |
| Layer 5 permeability | 100.00 mD |
Applying the formula below gives:
| Result | Value |
|---|---|
| Arithmetic (parallel beds, flow along the layers) | 110.88 mD |
| Harmonic (beds in series, flow across them) | 51.256 mD |
| Geometric (random heterogeneity) | 71.926 mD |
| Total thickness | 17.000 ft |
| Flow capacity Σkh | 1,885.0 |
Open this example in the calculator and change any input.
Formula
\(k_{arith} = \frac{\sum k_ih_i}{\sum h_i}, \quad k_{harm} = \frac{\sum h_i}{\sum h_i/k_i}, \quad k_{geom} = \exp\left(\frac{\sum h_i\ln k_i}{\sum h_i}\right)\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(h_1\) | Layer 1 thickness (0 if unused) | m |
| \(k_1\) | Layer 1 permeability | m² |
| \(h_2\) | Layer 2 thickness (0 if unused) | m |
| \(k_2\) | Layer 2 permeability | m² |
| \(h_3\) | Layer 3 thickness (0 if unused) | m |
| \(k_3\) | Layer 3 permeability | m² |
| \(h_4\) | Layer 4 thickness (0 if unused) | m |
| \(k_4\) | Layer 4 permeability | m² |
| \(h_5\) | Layer 5 thickness (0 if unused) | m |
| \(k_5\) | Layer 5 permeability | m² |
| \(k_{arith}\) | Arithmetic (parallel beds, flow along the layers) | m² |
| \(k_{harm}\) | Harmonic (beds in series, flow across them) | m² |
| \(k_{geom}\) | Geometric (random heterogeneity) | m² |
| \(h_t\) | Total thickness | m |
| \(\Sigma kh\) | Flow capacity Σkh | - |
Method and standards
Permeability averaging.
Where it is used
- Upscaling core data to layers.
- Comparing core and well-test permeability.
Common mistakes
- Using the arithmetic mean for vertical flow.
- Averaging without thickness weighting.
Assumptions and limits
- Uniform properties within each layer.
Questions and answers
Why can the averages differ so much?
The harmonic mean is dominated by the tightest layer and the arithmetic mean by the best; a single 1 mD bed in series can choke flow that parallel beds would carry easily.
Which one goes into a well test comparison?
The arithmetic (kh-weighted) value: a well test measures the total flow capacity Σkh of the layers it drains.
What do the defaults represent?
Four beds of 4, 6, 2 and 5 ft at 150, 60, 400 and 25 mD; the fifth layer is unused.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Ahmed, Reservoir Engineering Handbook, 5th ed. (Gulf Professional Publishing, 2019), ch. 4, eqs. 4-49 to 4-55 and Examples 4-11 to 4-13