Worked example
Example: 1500 ft well in 30 ft of 20 mD pay, kh/kv = 5. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Horizontal permeability | 20.000 mD |
| Vertical permeability | 4.0000 mD |
| Net pay thickness | 30.000 ft |
| Horizontal length of the well | 1,500.0 ft |
| Drainage area of the well | 80.000 acre |
| Oil viscosity | 2.0000 cP |
| Oil formation volume factor | 1.1500 - |
| Wellbore radius | 0.35000 ft |
| Pressure at the drainage boundary | 2,500.0 psi |
| Flowing bottom-hole pressure | 1,800.0 psi |
Applying the formula below gives:
| Result | Value |
|---|---|
| Drainage radius of the horizontal well | 1,053.2 ft |
| Half major axis of the drainage ellipse (Joshi) | 1,194.0 ft |
| Productivity index, Borisov (isotropic) | 1.7028 bbl/(d·psi) |
| Productivity index, Giger–Reiss–Jourdan | 1.2184 bbl/(d·psi) |
| Productivity index, Joshi | 1.3044 bbl/(d·psi) |
| Productivity index, Renard–Dupuy | 1.5765 bbl/(d·psi) |
| Oil rate by Joshi | 913.09 bbl/d |
| Productivity index of a vertical well in the same area | 0.23066 bbl/(d·psi) |
| Gain over the vertical well (Joshi) | 5.6551 |
Open this example in the calculator and change any input.
Formula
\(J_J = \frac{2\pi k_h h/(\mu_o B_o)}{\ln R + \frac{\beta^2 h}{L}\ln\frac{h}{2r_w}}, \quad R = \frac{a + \sqrt{a^2 - (L/2)^2}}{L/2}, \quad a = \frac{L}{2}\left[0.5 + \sqrt{0.25 + (2r_{eh}/L)^4}\right]^{1/2}, \quad \beta = \sqrt{k_h/k_v}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(k_h\) | Horizontal permeability | m² |
| \(k_v\) | Vertical permeability | m² |
| \(h\) | Net pay thickness | m |
| \(L\) | Horizontal length of the well | m |
| \(A\) | Drainage area of the well | m² |
| \(\mu_o\) | Oil viscosity | Pa·s |
| \(B_o\) | Oil formation volume factor | - |
| \(r_w\) | Wellbore radius | m |
| \(p_e\) | Pressure at the drainage boundary | Pa |
| \(p_{wf}\) | Flowing bottom-hole pressure | Pa |
| \(r_{eh}\) | Drainage radius of the horizontal well | m |
| \(a\) | Half major axis of the drainage ellipse (Joshi) | m |
| \(J_{Borisov}\) | Productivity index, Borisov (isotropic) | m³/(s·Pa) |
| \(J_{Giger}\) | Productivity index, Giger–Reiss–Jourdan | m³/(s·Pa) |
| \(J_{Joshi}\) | Productivity index, Joshi | m³/(s·Pa) |
| \(J_{RD}\) | Productivity index, Renard–Dupuy | m³/(s·Pa) |
| \(q_{oh}\) | Oil rate by Joshi | m³/s |
| \(J_v\) | Productivity index of a vertical well in the same area | m³/(s·Pa) |
| \(J_h/J_v\) | Gain over the vertical well (Joshi) | - |
Method and standards
Steady-state horizontal-well inflow.
Where it is used
- Comparing horizontal and vertical wells.
- Sizing horizontal well length.
Common mistakes
- Using the reservoir area instead of the well's drainage area.
- Ignoring anisotropy.
Assumptions and limits
- Steady state; single phase; well centred in the pay.
Questions and answers
Why do the four methods give different answers?
Each idealises the drainage shape differently (ellipse, cylinder or slab); for long wells in thin pay they converge, for short wells they spread.
What does vertical permeability do?
Low k_v makes the vertical flow into the wellbore harder and the productivity falls. Authors treat it differently: Giger and Joshi use β², Renard–Dupuy uses β.
What do the defaults represent?
An illustrative case: 1500 ft well in 30 ft of 20 mD pay, kh/kv = 5. Replace the inputs with your own data.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Ahmed, Reservoir Engineering Handbook, 5th ed. (Gulf Professional Publishing, 2019), ch. 7, eqs. 7-45 to 7-60 and Examples 7-13 and 7-14