Worked example
Example: 0.25 t/h water, 10 min. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Water removed | 0.25000 t/h |
| Adsorption time per bed | 10.000 min |
| Working capacity (kg water per kg sieve) | 0.080000 kg/kg |
| Sieve bulk density | 700.00 kg/m³ |
Applying the formula below gives:
| Result | Value |
|---|---|
| Water per cycle | 41.667 kg |
| Sieve per bed | 0.52083 t |
| Bed volume | 0.74405 m³ |
Open this example in the calculator and change any input.
Formula
\(m_s = \frac{\dot m_w t_c}{q}, \quad V = \frac{m_s}{\rho_b}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\dot m_w\) | Water removed | kg/s |
| \(t_c\) | Adsorption time per bed | s |
| \(q\) | Working capacity (kg water per kg sieve) | kg/kg |
| \(\rho_b\) | Sieve bulk density | kg/m³ |
| \(m_w\) | Water per cycle | kg |
| \(m_s\) | Sieve per bed | kg |
| \(V\) | Bed volume | m³ |
Method and standards
Mass balance.
Where it is used
- MSDH sizing and sieve replacement.
Common mistakes
- Equilibrium capacity used.
Assumptions and limits
- Constant water load.
References
- Adsorption mass balance m_s = ṁ_w t_c / q
Questions and answers
Why 3A sieve?
Its pores admit water but not ethanol.
Working capacity?
Much less than equilibrium because beds switch before breakthrough and do not fully regenerate.
Two beds?
One adsorbs while the other regenerates; size each for one cycle.