Worked example
Example: 10 t/h for 100 KLPD. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Steam to distillation (measured) | 10.000 t/h |
| Alcohol produced (absolute, measured) | 100.00 kL/d |
| Planned capacity | 150.00 kL/d |
Applying the formula below gives:
| Result | Value |
|---|---|
| Specific steam | 2.4000 kg/L |
| Steam for the planned capacity | 15.000 t/h |
Open this example in the calculator and change any input.
Formula
\(s = \frac{\dot m_s}{\dot V_a}, \quad \dot m_p = s \dot V_p\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\dot m_s\) | Steam to distillation (measured) | kg/s |
| \(\dot V_a\) | Alcohol produced (absolute, measured) | m³/s |
| \(\dot V_p\) | Planned capacity | m³/s |
| \(s\) | Specific steam | kg/m³ |
| \(\dot m_p\) | Steam for the planned capacity | kg/s |
Method and standards
Definitions.
Where it is used
- Distillery energy reporting.
- Boiler sizing for expansions.
Common mistakes
- Bulk litres used.
Assumptions and limits
- Steady operation.
- Steam is counted by mass with no pressure or enthalpy basis: compare plants and scale to a new capacity only at the same steam conditions. Scaling assumes the planned plant has the same specific steam.
References
- Definition s = ṁ_s/V̇_a (kg per litre = t/kL)
Questions and answers
Why is it in kg/L?
Steam per litre of absolute alcohol is the distillery's main energy KPI.
What lowers it?
Higher wash strength, multi-pressure heat integration and preheating the wash.
Dehydration steam?
Include the molecular sieve's steam if you compare whole plants.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.