Chloride Ingress to Rebar: Corrosion Initiation Time

Time for chlorides to reach the corrosion threshold at the rebar from cover depth, surface chloride and apparent diffusion coefficient by Fick's second law.

Inputs

Examples: Illustrative marine concrete, 50 mm coverFly ash concrete, 40 mm coverCar park deck, 30 mm cover

Accepted: 5 to 200 mm
Accepted: 0.31558 to 3,155.8 mm²/a
Accepted: 0.1 to 10 %
Accepted: 0 to 5 %
Accepted: 0.1 to 5 %
Accepted: 0.99817 to 199.63 a

Results

C(x,t) = C_i + (C_s − C_i)[1 − erf(x/2√(D_at))] (Fick's second law, constant D_a and C_s). Initiation when C reaches the threshold at the bar: t_i = x²/(4D_az²), erf z = 1 − (C_crit − C_i)/(C_s − C_i). Doubling cover quadruples initiation time. Real D_a falls with age (fly ash and slag concrete especially), so constant-D results are conservative for good mixes; propagation time after initiation is extra.

Corrosion initiation time34.701a
Chloride at the rebar at the service life1.1060%
Cover needed to reach the service life67.903mm

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative marine concrete, 50 mm cover. The inputs, in the units selected above:

InputValue
Concrete cover50.000 mm
Apparent chloride diffusion coefficient31.558 mm²/a
Surface chloride (by mass of binder)3.0000 %
Initial chloride0.10000 %
Critical (threshold) chloride0.40000 %
Service life to check50.000 a

Applying the formula below gives:

ResultValue
Corrosion initiation time14.938 a
Chloride at the rebar at the service life1.1830 %
Cover needed to reach the service life91.475 mm

Open this example in the calculator and change any input.

Formula

\(C(x,t) = C_i + (C_s - C_i)\left[1 - \text{erf}\frac{x}{2\sqrt{D_at}}\right], \quad t_i = \frac{x^2}{4D_az^2}\)

Variables

Symbol Meaning SI unit
\(x\) Concrete cover m
\(D_a\) Apparent chloride diffusion coefficient m²/s
\(C_s\) Surface chloride (by mass of binder) -
\(C_i\) Initial chloride -
\(C_{crit}\) Critical (threshold) chloride -
\(t_s\) Service life to check s
\(t_i\) Corrosion initiation time s
\(C(x, t_s)\) Chloride at the rebar at the service life -
\(x_{min}\) Cover needed to reach the service life m

Method and standards

Chloride ingress.

Where it is used

  • Durability design of marine and de-iced structures.
  • Assessing remaining life of existing concrete.

Common mistakes

  • Mixing chloride by mass of concrete and of binder.
  • Using short-term D_a as constant for decades.

Assumptions and limits

  • Constant D_a and surface chloride; one-dimensional diffusion; uncracked concrete.

References

  • Fick's second law for chloride ingress (initiation period)

Questions and answers

Why does cover matter so much?

Initiation time grows with the square of cover depth.

What threshold should I use?

Often 0.2–0.4 % chloride by mass of binder for normal reinforcement; it depends on the concrete and exposure.

What do the defaults represent?

An illustrative marine-exposed concrete: 50 mm cover, D_a 1 × 10⁻¹² m²/s, 3 % surface chloride, 0.1 % initial and 0.4 % threshold, checked at 50 years.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Tuutti, Corrosion of Steel in Concrete (Swedish Cement and Concrete Research Institute, 1982), Fontana, Corrosion Engineering, 3rd ed. (McGraw-Hill, 1986)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.