Equipment Cost Scaling: Six-Tenths Rule and Cost Index

Cost of equipment or a plant of a different capacity from a known cost by the capacity exponent (six-tenths rule), brought up to date with a cost index.

Inputs

Examples: Illustrative scale-up to 120Smaller pump setVessel, exponent 0.7

Accepted: 0 to 1E+15
Accepted: 1E-9 to 1E+12
Accepted: 1E-9 to 1E+12
Accepted: 0.2 to 1.2
Accepted: 1 to 100,000
Accepted: 1 to 100,000

Results

Equipment cost rises less than in proportion to size, roughly as capacity to the power 0.6 (the six-tenths rule), because wall area, controls and engineering grow more slowly than volume. Exponents range from about 0.4 to 0.9 by equipment type. A cost index (such as the Chemical Engineering Plant Cost Index or a national wholesale price index) brings an old cost to today's prices. Use for order-of-magnitude estimates (±30 %), within about a factor of ten in size.

Estimated cost now336,396
Size factor0.77460
Escalation factor1.0857
Cost per unit of capacity5,606.6

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative scale-up to 120. The inputs, in the units selected above:

InputValue
Known cost (your currency)1.0000e+07 -
Capacity of the known item50.000 -
Capacity wanted120.00 -
Capacity exponent0.60000 -
Cost index when the known cost applied600.00 -
Cost index now800.00 -

Applying the formula below gives:

ResultValue
Estimated cost now2.2546e+07
Size factor1.6909
Escalation factor1.3333
Cost per unit of capacity187,882

Open this example in the calculator and change any input.

Formula

\(C_2 = C_1\left(\frac{S_2}{S_1}\right)^n\frac{I_2}{I_1}\)

Variables

Symbol Meaning SI unit
\(C_1\) Known cost (your currency) -
\(S_1\) Capacity of the known item -
\(S_2\) Capacity wanted -
\(n\) Capacity exponent -
\(I_1\) Cost index when the known cost applied -
\(I_2\) Cost index now -
\(C_2\) Estimated cost now -
\((S_2/S_1)^n\) Size factor -
\(I_2/I_1\) Escalation factor -
\(C_2/S_2\) Cost per unit of capacity -

Method and standards

Six-tenths rule.

Where it is used

  • Feasibility and budget estimates.
  • Comparing quotations for different sizes.

Common mistakes

  • Using one exponent for every equipment type.
  • Scaling far outside the known size.

Assumptions and limits

  • Same technology and site conditions.

References

  • Capacity-exponent cost scaling and cost-index escalation

Questions and answers

What does the six-tenths rule mean?

Doubling capacity raises cost by 2^0.6 = 1.52, not 2.

Which cost index should I use?

One for the same kind of plant and country, such as CEPCI for chemical plants.

What do the defaults represent?

An illustrative item costing 10 million at capacity 50 when the index was 600, scaled to capacity 120 at index 800.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Peters, Timmerhaus and West, Plant Design and Economics for Chemical Engineers, 5th ed. (McGraw-Hill, 2003)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.