FireCADCalc

Reorder Point and Safety Stock for a Service Level

Safety stock and reorder point for spare parts or materials from the mean and spread of demand, the lead time and the service level wanted.

Inputs

Examples: Illustrative item, 95 %Critical spare, 99 %Fast mover, 90 %

Accepted: 0 to 1E+9
Accepted: 0 to 1E+9
Accepted: 0.041667 to 1,157.4 d
Accepted: 50 to 99.99 %

Results

With demand varying randomly from day to day, demand over the lead time has mean d̄L and standard deviation σ_d√L. Holding safety stock z σ_d √L covers it with probability SL, where z is the standard normal value for SL (1.645 for 95 %). Reorder when stock falls to d̄L + SS. Variable lead times need a larger safety stock: σ = √(L σ_d² + d̄² σ_L²).

Safety factor1.6449
Safety stock (units)62.418
Expected demand over the lead time (units)400.00
Reorder point (units)462.42

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative item, 95 %. The inputs, in the units selected above:

InputValue
Mean demand per day (units)40.000 -
Standard deviation of daily demand12.000 -
Lead time10.000 d
Cycle service level (chance of no stock-out per cycle)95.000 %

Applying the formula below gives:

ResultValue
Safety factor1.6449
Safety stock (units)62.418
Expected demand over the lead time (units)400.00
Reorder point (units)462.42

Open this example in the calculator and change any input.

Formula

\(SS = z\,\sigma_d\sqrt{L}, \quad ROP = \bar d L + SS\)

Variables

Symbol Meaning SI unit
\(\bar d\) Mean demand per day (units) -
\(\sigma_d\) Standard deviation of daily demand -
\(L\) Lead time s
\(SL\) Cycle service level (chance of no stock-out per cycle) -
\(z\) Safety factor -
\(SS\) Safety stock (units) -
\(\bar d L\) Expected demand over the lead time (units) -
\(ROP\) Reorder point (units) -

Method and standards

Reorder point.

Where it is used

  • Stores and spare parts planning.
  • Chemical and consumable stocks.

Common mistakes

  • Using the standard deviation of monthly demand with a daily mean.
  • Treating the service level as fill rate.

Assumptions and limits

  • Normal, independent daily demand; fixed lead time.

References

  • Normal-demand safety stock for a cycle service level

Questions and answers

What safety factor goes with 95 %?

z = 1.645; 99 % needs 2.326.

Why does safety stock grow only with the square root of lead time?

Daily variations partly cancel over a longer period.

What do the defaults represent?

An illustrative item used at 40 a day (standard deviation 12) with a 10-day lead time at a 95 % service level.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Silver, Pyke and Peterson, Inventory Management and Production Planning and Scheduling, 3rd ed. (Wiley, 1998)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.