PERT Path Duration and Probability of Completion

Expected duration and variance of up to five critical-path activities from optimistic, most likely and pessimistic times, and the chance of finishing by a target.

Inputs

Examples: Illustrative five-activity pathThree activities, tight targetCertain durations

Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 11,574 d
Accepted: 0 to 115,740 d

Results

PERT treats each activity time as a beta distribution with mean (a + 4m + b)/6 and standard deviation (b − a)/6. Along the critical path the means and variances add, and by the central limit theorem the path duration is taken as normal, giving the probability of finishing by the target date as Φ((T_s − T_e)/σ). Near-critical paths can also finish late, so the true probability is somewhat lower.

Expected path duration7.0000d
Standard deviation of the path0d
Standard normal value10.000
Probability of finishing by the target100.00%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative five-activity path. The inputs, in the units selected above:

InputValue
Activity 1 optimistic2.0000 d
Activity 1 most likely4.0000 d
Activity 1 pessimistic6.0000 d
Activity 2 optimistic3.0000 d
Activity 2 most likely5.0000 d
Activity 2 pessimistic9.0000 d
Activity 3 optimistic4.0000 d
Activity 3 most likely6.0000 d
Activity 3 pessimistic8.0000 d
Activity 4 optimistic (0 = none)1.0000 d
Activity 4 most likely2.0000 d
Activity 4 pessimistic3.0000 d
Activity 5 optimistic (0 = none)5.0000 d
Activity 5 most likely7.0000 d
Activity 5 pessimistic12.000 d
Target completion time26.000 d

Applying the formula below gives:

ResultValue
Expected path duration24.833 d
Standard deviation of the path1.8333 d
Standard normal value0.63636
Probability of finishing by the target73.773 %

Open this example in the calculator and change any input.

Formula

\(t_e = \frac{a + 4m + b}{6}, \quad \sigma^2 = \sum\left(\frac{b - a}{6}\right)^2, \quad P = \Phi\left(\frac{T_s - T_e}{\sigma}\right)\)

Variables

Symbol Meaning SI unit
\(a_1\) Activity 1 optimistic s
\(m_1\) Activity 1 most likely s
\(b_1\) Activity 1 pessimistic s
\(a_2\) Activity 2 optimistic s
\(m_2\) Activity 2 most likely s
\(b_2\) Activity 2 pessimistic s
\(a_3\) Activity 3 optimistic s
\(m_3\) Activity 3 most likely s
\(b_3\) Activity 3 pessimistic s
\(a_4\) Activity 4 optimistic (0 = none) s
\(m_4\) Activity 4 most likely s
\(b_4\) Activity 4 pessimistic s
\(a_5\) Activity 5 optimistic (0 = none) s
\(m_5\) Activity 5 most likely s
\(b_5\) Activity 5 pessimistic s
\(T_s\) Target completion time s
\(T_e\) Expected path duration s
\(\sigma\) Standard deviation of the path s
\(z\) Standard normal value -
\(P\) Probability of finishing by the target -

Method and standards

PERT.

Where it is used

  • Shutdown and project planning.
  • Project management examinations.

Common mistakes

  • Ignoring near-critical paths.
  • Using ranges that are not truly optimistic and pessimistic.

Assumptions and limits

  • Independent activities; normal path duration.

References

  • Industrial engineering practice (work study, line balancing, quality and project management)

Questions and answers

What is the chance of finishing the default path in 26 days?

Expected 24.8 days with σ 1.83 days: about 74 %.

Why (a + 4m + b)/6?

It is the mean of the beta distribution PERT assumes for each activity.

What do the defaults represent?

An illustrative five-activity critical path with optimistic, most likely and pessimistic times in days, and a 26-day target.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.