FireCADCalc

Power Plant Screening Curves and Crossover Capacity Factor

Annual cost per kW of two generating options against capacity factor from capital, fixed O&M, efficiency and fuel price, with the crossover capacity factor.

Thermal power plant

Inputs

Examples: Illustrative gas vs coalPeaker vs CCGTDiesel vs solar-like (no fuel)

Accepted: 0 to 20,000
Accepted: 0 to 1,000
Accepted: 5 to 100 %
Accepted: 0 to 100
Accepted: 0 to 20,000
Accepted: 0 to 1,000
Accepted: 5 to 100 %
Accepted: 0 to 100
Accepted: 0 to 30 %
Accepted: 1 to 60
Accepted: 0 to 100 %

Results

Annual cost per kW = CRF·C + O + v·8.76·CF (v per MWh, 8.76 MWh per kW at CF = 1). The plant with the lower line is cheapest at that capacity factor; the crossover sets which plant should serve base and which peak load. Variable O&M and carbon prices can be added to the fuel price.

Plant 1 annual fixed cost (per kW·year)63.486
Plant 1 variable cost (per MWh)82.286
Plant 2 annual fixed cost (per kW·year)110.81
Plant 2 variable cost (per MWh)49.655
Crossover capacity factor16.556%
Plant 1 cost per kW·year at CF207.65
Plant 2 cost per kW·year at CF197.81

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative gas vs coal. The inputs, in the units selected above:

InputValue
Plant 1 capital cost (per kW)900.00 -
Plant 1 fixed O&M (per kW·year)20.000 -
Plant 1 efficiency38.000 %
Plant 1 fuel price (per GJ)9.0000 -
Plant 2 capital cost (per kW)2,200.0 -
Plant 2 fixed O&M (per kW·year)45.000 -
Plant 2 efficiency40.000 %
Plant 2 fuel price (per GJ)3.0000 -
Discount rate8.0000 %
Life (years)25.000 -
Capacity factor to compare at60.000 %

Applying the formula below gives:

ResultValue
Plant 1 annual fixed cost (per kW·year)104.31
Plant 1 variable cost (per MWh)85.263
Plant 2 annual fixed cost (per kW·year)251.09
Plant 2 variable cost (per MWh)27.000
Crossover capacity factor28.759 %
Plant 1 cost per kW·year at CF552.45
Plant 2 cost per kW·year at CF393.01

Open this example in the calculator and change any input.

Formula

\(Y = CRF\cdot C + O + 8.76\,v\,CF, \quad v = \frac{3.6c_f}{\eta}, \quad CF^* = \frac{A_2 - A_1}{8.76(v_1 - v_2)}\)

Variables

Symbol Meaning SI unit
\(C_1\) Plant 1 capital cost (per kW) -
\(O_1\) Plant 1 fixed O&M (per kW·year) -
\(\eta_1\) Plant 1 efficiency -
\(c_{f,1}\) Plant 1 fuel price (per GJ) -
\(C_2\) Plant 2 capital cost (per kW) -
\(O_2\) Plant 2 fixed O&M (per kW·year) -
\(\eta_2\) Plant 2 efficiency -
\(c_{f,2}\) Plant 2 fuel price (per GJ) -
\(i\) Discount rate -
\(n\) Life (years) -
\(CF\) Capacity factor to compare at -
\(A_1\) Plant 1 annual fixed cost (per kW·year) -
\(v_1\) Plant 1 variable cost (per MWh) -
\(A_2\) Plant 2 annual fixed cost (per kW·year) -
\(v_2\) Plant 2 variable cost (per MWh) -
\(CF^*\) Crossover capacity factor -
\(Y_1\) Plant 1 cost per kW·year at CF -
\(Y_2\) Plant 2 cost per kW·year at CF -

Method and standards

Screening curves.

Where it is used

  • Generation expansion screening.
  • Teaching power system economics.

Common mistakes

  • Comparing plants on capital cost alone.
  • Mixing fuel prices per GJ HHV and LHV with efficiencies on another basis.

Assumptions and limits

  • Constant prices; no unit commitment or reserve value.

References

  • Screening-curve method of generation planning

Questions and answers

What do screening curves show?

For each plant, cost per kW-year rises linearly with running hours; cheap-to-build, expensive-to-run plants win at low capacity factors and the reverse at high ones.

Why does the crossover matter?

Combined with the load duration curve it tells planners how much of each plant type the system needs.

What do the defaults represent?

An illustrative gas plant (900 per kW, 38 %, fuel 9 per GJ) against a coal plant (2,200 per kW, 40 %, fuel 3 per GJ) at 8 % over 25 years, compared at 60 % capacity factor.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Gilbert Masters, Renewable and Efficient Electric Power Systems (Wiley, 2004), ch. 5

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.