Benefit–Cost Ratio and Net Present Value

Conventional and modified benefit–cost ratios and net present value from first cost, annual benefits and costs, salvage value, rate and life.

Inputs

Examples: Illustrative 2.5 M projectMarginal flood schemeShort-life equipment

Accepted: 0 to 1E+15
Accepted: 0 to 1E+15
Accepted: 0 to 1E+15
Accepted: 0 to 1E+15
Accepted: 1E-4 to 100 %
Accepted: 1 to 200

Results

Present worths use (P/A) for annual amounts and (P/F) = 1/(1 + i)ⁿ for the salvage. Conventional B/C = PW(benefits)/PW(costs); modified B/C subtracts operating costs from benefits and divides by the net investment. Both exceed 1 exactly when NPV > 0, but they rank projects differently: compare mutually exclusive alternatives incrementally, not by the largest ratio.

Present worth of benefits190,192
Present worth of costs (less salvage)160,718
Conventional benefit–cost ratio1.1834
Modified benefit–cost ratio1.2604
Net present value29,474

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 2.5 M project. The inputs, in the units selected above:

InputValue
Initial cost2,500,000 -
Annual benefit520,000 -
Annual operating and maintenance cost140,000 -
Salvage value at the end200,000 -
Discount rate7.0000 %
Life in years15.000 -

Applying the formula below gives:

ResultValue
Present worth of benefits4,736,115
Present worth of costs (less salvage)3,702,619
Conventional benefit–cost ratio1.2791
Modified benefit–cost ratio1.4257
Net present value1,033,497

Open this example in the calculator and change any input.

Formula

\(B/C = \frac{B(P/A)}{I + C(P/A) - S(P/F)}, \quad B/C_{mod} = \frac{(B - C)(P/A)}{I - S(P/F)}\)

Variables

Symbol Meaning SI unit
\(I\) Initial cost -
\(B\) Annual benefit -
\(C\) Annual operating and maintenance cost -
\(S\) Salvage value at the end -
\(i\) Discount rate -
\(n\) Life in years -
\(PW_B\) Present worth of benefits -
\(PW_C\) Present worth of costs (less salvage) -
\(B/C\) Conventional benefit–cost ratio -
\(B/C_{mod}\) Modified benefit–cost ratio -
\(NPV\) Net present value -

Method and standards

Benefit–cost.

Where it is used

  • Public works and energy project appraisal.
  • Comparing investment options.

Common mistakes

  • Ranking alternatives by ratio alone.
  • Counting a cost reduction as both benefit and cost.

Assumptions and limits

  • End-of-year flows; constant rate; certain cash flows.

References

  • Benefit–cost analysis

Questions and answers

Why are there two B/C ratios?

They treat operating costs differently (as costs or as reduced benefits); both agree on whether a project is worthwhile.

Should I pick the project with the highest B/C?

Not for mutually exclusive choices: compare the increment between alternatives.

What do the defaults represent?

An illustrative 2.5 M project with 520 k annual benefits, 140 k annual costs and 200 k salvage after 15 years at 7 %.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Newnan, Eschenbach and Lavelle, Engineering Economic Analysis, 13th ed. (Oxford, 2017)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.