Worked example
Example: Illustrative 11 kV/433 V on 10.5 kV supply. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Rated primary voltage | 11.000 kV |
| Rated secondary voltage (no load) | 433.00 V |
| Actual primary voltage | 10.500 kV |
| Target secondary voltage at load | 415.00 V |
| Voltage regulation at the load | 3.0000 % |
| Tap step | 2.5000 % |
| Taps either side of nominal | 2.0000 - |
Applying the formula below gives:
| Result | Value |
|---|---|
| Required tap (positive adds HV turns) | -3.3931 % |
| Selected tap position | -1.0000 |
| Resulting secondary voltage at load | 411.20 V |
| Deviation from target | -0.91600 % |
Open this example in the calculator and change any input.
Formula
\(a_{req} = \frac{V_p(1 - \varepsilon)}{V_t}, \quad t_{req} = \frac{a_{req}}{a_n} - 1, \quad V_s = \frac{V_p(1 - \varepsilon)}{a_n(1 + ks)}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(V_{pn}\) | Rated primary voltage | V |
| \(V_{sn}\) | Rated secondary voltage (no load) | V |
| \(V_p\) | Actual primary voltage | V |
| \(V_t\) | Target secondary voltage at load | V |
| \(\varepsilon\) | Voltage regulation at the load | - |
| \(s\) | Tap step | - |
| \(n\) | Taps either side of nominal | - |
| \(t_{req}\) | Required tap (positive adds HV turns) | - |
| \(k\) | Selected tap position | - |
| \(V_s\) | Resulting secondary voltage at load | V |
| \(\Delta V/V_t\) | Deviation from target | - |
Method and standards
Tap selection.
Where it is used
- Commissioning distribution transformers.
- Fixing persistent low or high voltage.
Common mistakes
- Moving the tap the wrong way.
- Ignoring light-load voltage rise.
Assumptions and limits
- Taps on HV winding; constant regulation.
References
- Turns-ratio adjustment by tapping
Questions and answers
Which way do I move the tap for higher secondary voltage?
Towards fewer HV turns (a negative or 'boost' tap); naming conventions vary, so check the rating plate.
Why include load regulation?
Secondary voltage drops under load; a tap chosen for no load leaves the load low.
What do the defaults represent?
An illustrative 11 kV/433 V transformer on a 10.5 kV supply, aiming for 415 V at load with 3 % regulation, ±2 taps of 2.5 %.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Harlow (ed.), Electric Power Transformer Engineering, 3rd ed. (CRC, 2012)