PV System Loss Budget, Performance Ratio and AC Energy

Performance ratio from a PV loss budget (temperature, soiling, shading, mismatch, wiring, inverter, transformer, availability) and the resulting AC energy per year.

Thermal power plant

Inputs

Examples: Illustrative 1 MWp, 1900 kWh/m2Hot dusty desert 2600 kWh/m2Northern rooftop 1100 kWh/m2

Accepted: 0 to 50 %
Accepted: 0 to 50 %
Accepted: 0 to 50 %
Accepted: 0 to 20 %
Accepted: 0 to 10 %
Accepted: 80 to 100 %
Accepted: 0 to 10 %
Accepted: 50 to 100 %
Accepted: 0.1 to 10,000,000 kW
Accepted: 27.778 to 2,777.8 kWh/m²

Results

PR is the product of the factors (1 − loss) and efficiencies; AC energy = P_DC·(H/1 kW/m²)·PR. Clipping, degradation and curtailment would add further factors.

Performance ratio81.506%
Total loss18.494%
Specific yield (kWh per kWp per year)1,548.6
Annual AC energy1,548.6MWh
Capacity factor (AC energy over DC rating)17.666%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative 1 MWp, 1900 kWh/m2. The inputs, in the units selected above:

InputValue
Temperature loss8.0000 %
Soiling loss2.0000 %
Shading loss2.0000 %
Mismatch and nameplate tolerance loss1.5000 %
DC wiring loss1.5000 %
Inverter efficiency (weighted)97.500 %
AC wiring and transformer loss1.5000 %
Availability99.000 %
Array rating (DC, at STC)1,000.0 kW
Annual irradiation on the array plane1,900.0 kWh/m²

Applying the formula below gives:

ResultValue
Performance ratio81.506 %
Total loss18.494 %
Specific yield (kWh per kWp per year)1,548.6
Annual AC energy1,548.6 MWh
Capacity factor (AC energy over DC rating)17.666 %

Open this example in the calculator and change any input.

Formula

\(PR = \prod_i(1 - l_i)\,\eta_{inv}A_v, \quad E_{AC} = P_{DC}\frac{H}{1\,\text{kW/m}^2}PR\)

Variables

Symbol Meaning SI unit
\(l_T\) Temperature loss -
\(l_s\) Soiling loss -
\(l_{sh}\) Shading loss -
\(l_m\) Mismatch and nameplate tolerance loss -
\(l_{dc}\) DC wiring loss -
\(\eta_{inv}\) Inverter efficiency (weighted) -
\(l_{ac}\) AC wiring and transformer loss -
\(A_v\) Availability -
\(P_{DC}\) Array rating (DC, at STC) W
\(H\) Annual irradiation on the array plane J/m²
\(PR\) Performance ratio -
\(1 - PR\) Total loss -
\(Y_f\) Specific yield (kWh per kWp per year) -
\(E_{AC}\) Annual AC energy J
\(CF\) Capacity factor (AC energy over DC rating) -

Method and standards

Loss-budget performance ratio.

Where it is used

  • Energy yield estimates and contract guarantees.
  • Diagnosing under-performing plants.

Common mistakes

  • Adding losses instead of multiplying factors.
  • Counting temperature loss twice (in PR and in the irradiation data).

Assumptions and limits

  • Independent loss factors; annual averages.

References

  • PV system loss factors and performance ratio

Questions and answers

What performance ratio is good?

About 0.80–0.85 for well-built modern plants; hot climates and dirty sites sit nearer 0.75.

Which loss is largest?

Usually temperature (5–12 % in warm climates), then inverter and soiling.

What do the defaults represent?

An illustrative 1 MWp plant with 1,900 kWh/m² per year on the array and typical losses: 8 % temperature, 2 % soiling, 2 % shading, 1.5 % mismatch, 1.5 % DC and AC wiring, 97.5 % inverter, 99 % availability.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Gilbert Masters, Renewable and Efficient Electric Power Systems (Wiley, 2004), ch. 9

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.