FireCADCalc

Boost Converter Duty Cycle, Inductor and Output Capacitor

Duty cycle, average and peak inductor current, inductance for a chosen ripple and output capacitance for a ripple voltage of a boost (step-up) converter.

Inputs

Examples: Illustrative: 5 V to 12 V, 0.5 A, 400 kHz, 30 % ripple, 50 mVBattery 3.7 V to 5 V, 1 A, 1 MHz12 V to 48 V, 2 A, 100 kHz (high duty)

Accepted: 0.5 to 1,000 V
Accepted: 1 to 2,000 V
Accepted: 0.001 to 1,000 A
Accepted: 1 to 100,000 kHz
Accepted: 5 to 200 %
Accepted: 0.1 to 10,000 mV
Accepted: 50 to 100 %

Results

Continuous conduction: L = V_in D/(f ΔI), C ≥ I_out D/(f ΔV). The output capacitor carries pulsed current; its ESR and ripple current rating usually decide it.

Duty cycle63.333%
Average inductor (input) current1.3636A
Inductor ripple current0.40909A
Inductance19.352µH
Peak inductor and switch current1.5682A
Minimum output capacitance (ignoring ESR)15.833µF

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative: 5 V to 12 V, 0.5 A, 400 kHz, 30 % ripple, 50 mV. The inputs, in the units selected above:

InputValue
Input voltage5.0000 V
Output voltage12.000 V
Output current0.50000 A
Switching frequency400.00 kHz
Inductor ripple ratio ΔI/I_L30.000 %
Allowed output ripple (peak to peak)50.000 mV
Estimated efficiency88.000 %

Applying the formula below gives:

ResultValue
Duty cycle63.333 %
Average inductor (input) current1.3636 A
Inductor ripple current0.40909 A
Inductance19.352 µH
Peak inductor and switch current1.5682 A
Minimum output capacitance (ignoring ESR)15.833 µF

Open this example in the calculator and change any input.

Formula

\(D = 1 - \frac{\eta V_{in}}{V_{out}}, \quad I_L = \frac{V_{out}I_{out}}{\eta V_{in}}, \quad L = \frac{V_{in}D}{f_s\,\Delta I_L}, \quad C_{out} = \frac{I_{out}D}{f_s\Delta V_{out}}\)

Variables

Symbol Meaning SI unit
\(V_{in}\) Input voltage V
\(V_{out}\) Output voltage V
\(I_{out}\) Output current A
\(f_s\) Switching frequency 1/s
\(r\) Inductor ripple ratio ΔI/I_L -
\(\Delta V_{out}\) Allowed output ripple (peak to peak) V
\(\eta\) Estimated efficiency -
\(D\) Duty cycle -
\(I_L\) Average inductor (input) current A
\(\Delta I_L\) Inductor ripple current A
\(L\) Inductance H
\(I_{pk}\) Peak inductor and switch current A
\(C_{out}\) Minimum output capacitance (ignoring ESR) F

Method and standards

Boost converter steady-state analysis.

Where it is used

  • LED drivers, battery-powered devices, PV and fuel-cell front ends.
  • Selecting the switch, diode, inductor and capacitor.

Common mistakes

  • Sizing the inductor on the output current instead of the input current.
  • Forgetting the right-half-plane zero in loop design.

Assumptions and limits

  • Continuous conduction, steady state.

References

  • Steady-state boost converter relations

Questions and answers

Why is the input current larger than the output current?

Power is conserved: stepping 5 V up to 12 V at 0.5 A needs about 1.4 A from the input at 88 % efficiency.

What limits the voltage gain?

Losses: the ideal gain 1/(1 − D) collapses at high duty cycles because the inductor and switch resistances dissipate rising power.

What do the defaults represent?

An illustrative 5 V to 12 V, 0.5 A boost at 400 kHz with 30 % ripple and 50 mV output ripple.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Erickson and Maksimović, Fundamentals of Power Electronics, 2nd ed. (Kluwer, 2001), ch. 2

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.