FireCADCalc

Ash Sluicing: Water, Slurry Flow and Pump Power

Water, slurry flow and density and pump power for hydraulic ash disposal from the ash rate, slurry concentration, solid density and pump head.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationPulp and paper

Inputs

Examples: 20 t/h at 20 %High concentration 55 %

Results

Check the line velocity with the slurry transport calculator. The head is in metres of slurry; for coarse ash a slurry pump also gives less head and efficiency than on water, so derate the pump curve.

Water flow16.364t/h
Slurry density1,426.7kg/m³
Concentration by volume35.668%
Slurry flow25.487m³/h
Pump power14.408kW
Water per tonne of ash0.81818kg/kg

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 20 t/h at 20 %. The inputs, in the units selected above:

InputValue
Ash to dispose20.000 t/h
Slurry concentration by mass20.000 %
Ash particle density2,200.0 kg/m³
Water density998.00 kg/m³
Pump head (metres of slurry)60.000 m
Slurry pump efficiency60.000 %

Applying the formula below gives:

ResultValue
Water flow80.000 t/h
Slurry density1,120.4 kg/m³
Concentration by volume10.186 %
Slurry flow89.251 m³/h
Pump power27.241 kW
Water per tonne of ash4.0000 kg/kg

Open this example in the calculator and change any input.

Formula

\(\dot m_w = \dot m_a\frac{1 - C_w}{C_w}, \quad Q = \frac{\dot m_a}{\rho_s} + \frac{\dot m_w}{\rho_w}, \quad \rho_m = \frac{\dot m_a + \dot m_w}{Q}, \quad P = \frac{\rho_m g Q H}{\eta}\)

\(C_v = \frac{\dot m_a / \rho_s}{Q}, \quad \frac{\dot m_w}{\dot m_a} = \frac{1 - C_w}{C_w}\)

Variables

Symbol Meaning SI unit
\(\dot m_a\) Ash to dispose kg/s
\(C_w\) Slurry concentration by mass -
\(\rho_s\) Ash particle density kg/m³
\(\rho_w\) Water density kg/m³
\(H\) Pump head, metres of slurry m
\(g\) standard gravity, 9.80665 m/s²
\(\eta\) Slurry pump efficiency -
\(\dot m_w\) Water flow kg/s
\(\rho_m\) Slurry density kg/m³
\(C_v\) Concentration by volume -
\(Q\) Slurry flow m³/s
\(P\) Pump power W
\(\dot m_w/\dot m_a\) Water per tonne of ash kg/kg

Method and standards

Slurry balance.

Where it is used

  • Ash disposal system sizing.
  • Water conservation by higher concentration.

Common mistakes

  • Using bulk density for particle density.
  • Pump head on water for coarse slurry.

Assumptions and limits

  • Uniform slurry. The head is in metres of slurry; no derating of pump head or efficiency for solids is applied.

References

  • Slurry mass and volume balance (definitions)

Questions and answers

Why so much water?

At 20 % solids each tonne of ash needs 4 tonnes of water; high-concentration systems cut this to under 1.

What is a usual line velocity?

2–3 m/s for fly ash slurry, more for coarse bottom ash.

What do the defaults give?

20 t/h of ash at 20 %: 80 t/h of water, 89 m³/h of slurry at about 1,120 kg/m³ and roughly 27 kW.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.