Worked example
Example: 20 t/h at 20 %. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Ash to dispose | 20.000 t/h |
| Slurry concentration by mass | 20.000 % |
| Ash particle density | 2,200.0 kg/m³ |
| Water density | 998.00 kg/m³ |
| Pump head (metres of slurry) | 60.000 m |
| Slurry pump efficiency | 60.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Water flow | 80.000 t/h |
| Slurry density | 1,120.4 kg/m³ |
| Concentration by volume | 10.186 % |
| Slurry flow | 89.251 m³/h |
| Pump power | 27.241 kW |
| Water per tonne of ash | 4.0000 kg/kg |
Open this example in the calculator and change any input.
Formula
\(\dot m_w = \dot m_a\frac{1 - C_w}{C_w}, \quad Q = \frac{\dot m_a}{\rho_s} + \frac{\dot m_w}{\rho_w}, \quad \rho_m = \frac{\dot m_a + \dot m_w}{Q}, \quad P = \frac{\rho_m g Q H}{\eta}\)
\(C_v = \frac{\dot m_a / \rho_s}{Q}, \quad \frac{\dot m_w}{\dot m_a} = \frac{1 - C_w}{C_w}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\dot m_a\) | Ash to dispose | kg/s |
| \(C_w\) | Slurry concentration by mass | - |
| \(\rho_s\) | Ash particle density | kg/m³ |
| \(\rho_w\) | Water density | kg/m³ |
| \(H\) | Pump head, metres of slurry | m |
| \(g\) | standard gravity, 9.80665 | m/s² |
| \(\eta\) | Slurry pump efficiency | - |
| \(\dot m_w\) | Water flow | kg/s |
| \(\rho_m\) | Slurry density | kg/m³ |
| \(C_v\) | Concentration by volume | - |
| \(Q\) | Slurry flow | m³/s |
| \(P\) | Pump power | W |
| \(\dot m_w/\dot m_a\) | Water per tonne of ash | kg/kg |
Method and standards
Slurry balance.
Where it is used
- Ash disposal system sizing.
- Water conservation by higher concentration.
Common mistakes
- Using bulk density for particle density.
- Pump head on water for coarse slurry.
Assumptions and limits
- Uniform slurry. The head is in metres of slurry; no derating of pump head or efficiency for solids is applied.
References
- Slurry mass and volume balance (definitions)
Questions and answers
Why so much water?
At 20 % solids each tonne of ash needs 4 tonnes of water; high-concentration systems cut this to under 1.
What is a usual line velocity?
2–3 m/s for fly ash slurry, more for coarse bottom ash.
What do the defaults give?
20 t/h of ash at 20 %: 80 t/h of water, 89 m³/h of slurry at about 1,120 kg/m³ and roughly 27 kW.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.