Tube Span Natural Frequency (Euler–Bernoulli Beam)

First natural frequency of a tube span from its length, end fixity, diameters, Young's modulus and mass per metre including contents and hydrodynamic added mass.

Thermal power plantProcess steam and utilitiesSugar mill and cogenerationDistillery and ethanolBoilerEconomiser and air preheater

Inputs

Examples: Economiser span 1.5 m pinnedClamped 2 m

Fluid inside the tube (ρ_in π d_i²/4) plus the hydrodynamic added mass of the fluid outside, about C_m ρ_out π d_o²/4 with C_m near 1 for an isolated tube (more in a close bundle).

Results

Real supports (baffles, ties) are between pinned and clamped; compare f_n with vortex shedding and acoustic frequencies with a margin.

Second moment of area13.956cm⁴
Total mass per metre5.3657kg/m
First natural frequency49.077Hz

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Economiser span 1.5 m pinned. The inputs, in the units selected above:

InputValue
Span between supports1.5000 m
End conditionsPinned–pinned (λ = π)
Tube outside diameter50.800 mm
Tube inside diameter44.200 mm
Young's modulus at temperature190.00 GPa
Tube material density7,850.0 kg/m³
Contents and added mass per metre1.5000 kg/m

Applying the formula below gives:

ResultValue
Second moment of area13.956 cm⁴
Total mass per metre5.3657 kg/m
First natural frequency49.077 Hz

Open this example in the calculator and change any input.

Formula

\(f_n = \frac{\lambda^2}{2\pi L^2}\sqrt{\frac{EI}{m}}, \quad I = \frac{\pi(d_o^4 - d_i^4)}{64}, \quad m = \rho_t\frac{\pi(d_o^2 - d_i^2)}{4} + m_a\)

\(\lambda = \pi\ (\text{pinned–pinned}), \quad 3.9266\ (\text{clamped–pinned}), \quad 4.7300\ (\text{clamped–clamped})\)

Variables

Symbol Meaning SI unit
\(L\) Span between supports m
\(\text{ends}\) End conditions -
\(\lambda\) first-mode eigenvalue for the end conditions -
\(d_o\) Tube outside diameter m
\(d_i\) Tube inside diameter m
\(E\) Young's modulus at temperature Pa
\(\rho_t\) Tube material density kg/m³
\(m_a\) Contents and added mass per metre kg/m
\(I\) Second moment of area m⁴
\(m\) Total mass per metre kg/m
\(f_n\) First natural frequency 1/s

Method and standards

Euler–Bernoulli beam theory for the first bending mode of a uniform span, with the eigenvalues for the chosen end conditions as tabulated by Blevins; the mass per metre is the tube metal plus the contents and added mass you enter.

Where it is used

  • Tube bank and economiser vibration checks.
  • Support spacing.

Common mistakes

  • Cold modulus at hot temperature.

Assumptions and limits

  • Uniform beam, small deflection.
  • The added mass is your input: contents ρ_in π d_i²/4 plus about C_m ρ_out π d_o²/4 for the fluid outside (C_m near 1 for an isolated tube, higher in a close bundle); for gas outside it is negligible.

References

  • Euler–Bernoulli beam f = (λ²/2πL²)√(EI/m) with λ = π
  • 3.9266
  • 4.7300 (Blevins, Formulas for Natural Frequency and Mode Shape)

Questions and answers

What is added mass?

Fluid around the tube moves with it; for gas it is small, for liquid it can be large.

Which end condition?

Supports usually lie between pinned and clamped: check both.

Why does it matter?

Resonance with vortex shedding or duct acoustics damages tubes and baffles.

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.