Worked example
Example: 70 t/h bagasse. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Bagasse to convey | 70.000 t/h |
| Peripheral speed of the last mill | 13.000 m/min |
| Conveyor speed / last-mill speed | 2.5000 - |
| Total conveyor length (upper and lower runs) | 120.00 m |
Applying the formula below gives:
| Result | Value |
|---|---|
| Width, rubber belt | 1,000.0 mm |
| Width, scraper conveyor | 1,076.9 mm |
| Conveyor speed | 32.500 m/min |
| Bagasse friction on steel at that speed (eqn 8.15) | 0.20250 |
| Conveyor power (1 kW per 5 m of total length) | 24.000 kW |
Open this example in the calculator and change any input.
Formula
\(W_b = \max\left(\frac{\dot m_b}{r_b},\ W_{b,\text{previous band}}\right),\ r_b = 6,\ 7,\ 8\ \mathrm{t/h\ per\ 100\ mm}, \quad W_s = \frac{\dot m_b}{6.5}, \quad v_c = k\,v, \quad \mu = \max(0,\ 0.43 - 0.007\,v_c)\ (v_c\ \text{in m/min}), \quad P = \frac{L_c}{5}\ \mathrm{kW}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\dot m_b\) | Bagasse to convey | kg/s |
| \(v\) | Peripheral speed of the last mill | m/s |
| \(k\) | Conveyor speed / last-mill speed | - |
| \(L_c\) | Total conveyor length (upper and lower runs) | m |
| \(r_b\) | Hugot's belt loading for the band: 6 (25–50 t/h), 7 (50–100 t/h), 8 (above 100 t/h) t/h per 100 mm | - |
| \(W_{b,\text{previous band}}\) | Width at the top of the previous band: 833 mm above 50 t/h, 1 429 mm above 100 t/h | m |
| \(W_b\) | Width, rubber belt | m |
| \(W_s\) | Width, scraper conveyor | m |
| \(v_c\) | Conveyor speed | m/s |
| \(\mu\) | Bagasse friction on steel at that speed (eqn 8.15) | - |
| \(P\) | Conveyor power (1 kW per 5 m of total length) | W |
Method and standards
Hugot's loading and power rules for bagasse conveyors (Handbook of Cane Sugar Engineering, 3rd ed., p. 99) and his friction relation, eqn 8.15. Hugot's belt bands share their end points at 50 and 100 t/h, so a literal reading makes the width fall just above each; the calculator keeps the width of the band below until the next band needs more.
Where it is used
- Sizing bagasse conveyors to the boilers.
- Checking a conveyor after a crush increase.
Common mistakes
- Using the cane rate instead of the bagasse rate.
Assumptions and limits
- Widths are Hugot's loading rules per 100 mm of width; belt speed, layer depth and bagasse density do not enter them.
- The belt width never falls as the load rises: from 50 to about 58 t/h it stays at 833 mm, and from 100 to about 114 t/h at 1 429 mm. Below 25 t/h Hugot gives no belt rule.
- Power is Hugot's average figure for a factory of average size, 1 kW per 5 m of total conveyor length (about twice the carrier length), independent of load, speed and lift.
References
- Hugot
- Handbook of Cane Sugar Engineering
- 3rd ed. (Elsevier, 1986)
- ch. 8
- bagasse conveyors and eqn 8.15
- pp. 98–99
Questions and answers
Belt or scraper?
Belts carry more per width and climb up to about 25°; scrapers climb to about 50° but wear and draw more power.
Why faster than the mill?
A conveyor running 2–3 times the last-mill speed carries a thin, even layer to the boilers.
Where does the friction formula apply?
Hugot's eqn 8.15 gives the friction of cane and bagasse on steel falling with speed; it matters for slopes and chutes.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.