Worked example
Example: Average 40 kW/tfh. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Crushing rate | 250.00 t/h |
| Fibre % cane | 14.500 % |
| Total installed preparation power per tonne fibre per hour | 40.000 kWh/t |
| Share of the installed power in the knives | 46.000 % |
| Absorbed / installed | 55.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Installed preparation power | 1,450.0 kW |
| Installed in the knives | 667.00 kW |
| Installed in the shredder | 783.00 kW |
| Mean absorbed power | 797.50 kW |
| Absorbed energy per tonne of cane | 3.1900 kWh/t |
Open this example in the calculator and change any input.
Formula
\(P_i = e\,A f, \quad P_k = s_k P_i, \quad P_s = (1 - s_k)P_i, \quad P_a = \varphi P_i, \quad E_c = \frac{P_a}{A}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(A\) | Crushing rate | kg/s |
| \(f\) | Fibre % cane | - |
| \(e\) | Total installed preparation power per tonne fibre per hour | J/kg |
| \(s_k\) | Share of the installed power in the knives | - |
| \(\varphi\) | Absorbed / installed | - |
| \(P_i\) | Installed preparation power | W |
| \(P_k\) | Installed in the knives | W |
| \(P_s\) | Installed in the shredder | W |
| \(P_a\) | Mean absorbed power | W |
| \(E_c\) | Absorbed energy per tonne of cane | J/kg |
Method and standards
Specific power on the fibre rate.
Where it is used
- Budgeting power for preparation.
- Comparing preparation intensity between mills.
Common mistakes
- Using power per tonne cane with fibre rate.
- Forgetting the knives when quoting shredder power.
Assumptions and limits
- Averages from practice. The specific power is per tonne of fibre per hour (shown in kWh/t = kW per t/h), not per tonne of cane; E_c is the absorbed energy per tonne of cane.
References
- Hugot
- Handbook of Cane Sugar Engineering
- 3rd ed. (Elsevier, 1986)
- ch. 6
- total power for cane preparation
- p. 70
Questions and answers
What is typical?
Hugot reports 24–60 kW installed per tonne fibre per hour, about 40 on average, slightly more in the shredder than the knives.
Why more power for better preparation?
Finer preparation opens more cells and raises extraction; heavy shredders use 40–50 kW/(t fibre/h) on their own.
Absorbed or installed?
Plants absorb about half to 60 % of the installed figure on average.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.