Worked example
Example: 250 TCH. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Crushing rate | 250.00 t/h |
| Bulk density, whole cane | 150.00 kg/m³ |
| Bulk density after the knives | 275.00 kg/m³ |
| Bulk density after the shredder | 300.00 kg/m³ |
| Speed of the carrier after the shredder | 15.000 m/min |
| Carrier width | 2.0000 m |
Applying the formula below gives:
| Result | Value |
|---|---|
| Volume flow, whole cane | 1,666.7 m³/h |
| Volume flow after the knives | 909.09 m³/h |
| Volume flow after the shredder | 833.33 m³/h |
| Overall compaction | 2.0000 |
| Bed depth of shredded cane | 462.96 mm |
Open this example in the calculator and change any input.
Formula
\(\dot V_i = \frac{A}{d_i}, \quad h_2 = \frac{A}{d_2\,u\,L}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(A\) | Crushing rate | kg/s |
| \(d_0\) | Bulk density, whole cane | kg/m³ |
| \(d_1\) | Bulk density after the knives | kg/m³ |
| \(d_2\) | Bulk density after the shredder | kg/m³ |
| \(u\) | Speed of the carrier after the shredder | m/s |
| \(L\) | Carrier width | m |
| \(\dot V_0\) | Volume flow, whole cane | m³/s |
| \(\dot V_1\) | Volume flow after the knives | m³/s |
| \(\dot V_2\) | Volume flow after the shredder | m³/s |
| \(d_2/d_0\) | Overall compaction | - |
| \(h_2\) | Bed depth of shredded cane | m |
Method and standards
Continuity with measured bulk densities.
Where it is used
- Sizing carriers and chutes after preparation.
- Checking the effect of a shredder on carrier loading.
Common mistakes
- Using whole-cane density for prepared cane.
- Mixing m/min and m/s.
Assumptions and limits
- Densities from local measurement where possible. A density that falls from one stage to the next, or lies outside Hugot's 125–400 kg/m³, is flagged.
References
- Hugot
- Handbook of Cane Sugar Engineering
- 3rd ed. (Elsevier, 1986)
- ch. 3 (p. 32) and ch. 6 (p. 70)
- bulk densities of whole
- knifed and shredded cane
Questions and answers
Why does the volume fall after the knives?
Cutting lets the pieces pack; bulk density roughly doubles from tangled whole cane.
Why do shredded densities differ so much?
They depend on fineness, fibre and how the sample is taken; Hugot reports 200 to 400 kg/m³.
What sets the bed depth?
Mass rate over density, width and speed: a faster carrier gives a thinner bed.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.