Worked example
Example: Illustrative 100 m of 4 mm tube. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Tube length | 100.00 m |
| Tube inside diameter | 4.0000 mm |
| Receiver (terminal) volume | 0.10000 L |
| Mean signal pressure (absolute) | 1.6000 bar |
| Air temperature | 20.000 °C |
| Air viscosity | 181.00 μP |
Applying the formula below gives:
| Result | Value |
|---|---|
| Transport delay | 0.29134 s |
| Time constant | 1.3113 s |
| 63 % response time | 1.6026 s |
| 98 % response time | 5.5365 s |
| Line volume | 1.2566 L |
Open this example in the calculator and change any input.
Formula
\(\theta = \frac Lc, \quad \tau = \frac{128\mu L}{\pi d^4}\,\frac{V_r + V_{line}/2}{\bar p}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(L\) | Tube length | m |
| \(d\) | Tube inside diameter | m |
| \(V_r\) | Receiver (terminal) volume | m³ |
| \(\bar p\) | Mean signal pressure (absolute) | Pa |
| \(T\) | Air temperature | K |
| \(\mu\) | Air viscosity | Pa·s |
| \(\theta\) | Transport delay | s |
| \(\tau\) | Time constant | s |
| \(t_{63}\) | 63 % response time | s |
| \(t_{98}\) | 98 % response time | s |
| \(V_{line}\) | Line volume | m³ |
Method and standards
Pneumatic lag.
Where it is used
- Pneumatic loop design and troubleshooting.
- Deciding where to place boosters.
Common mistakes
- Ignoring the receiver volume.
- Using outside diameter of tubing.
Assumptions and limits
- Laminar flow; isothermal; small signal change; lumped capacitance.
References
- Lumped laminar-flow RC model of a pneumatic line
Questions and answers
Why are long pneumatic lines slow?
The tubing resistance and volume both grow with length, so the time constant rises roughly with length squared.
How is the lag reduced?
Use a volume booster or positioner at the valve, larger tubing, or electronic transmission with an I/P converter at the valve.
What do the defaults represent?
An illustrative 100 m run of 4 mm ID tubing into a 0.1 L receiver at a mean 1.6 bar(a), air at 20 °C.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Lipták, Instrument Engineers' Handbook, Vol. 2: Process Control and Optimization, 4th ed. (CRC Press, 2006)