FireCADCalc

Total Measurement Uncertainty (Root Sum Square)

Total probable error of a measuring loop from up to five independent error sources by root-sum-square, with the worst case, in span units and per cent of reading.

Thermal power plantProcess steam and utilitiesRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: Flow loop 0–100 t/h at 60 t/hPressure 0–160 bar at 105 barTemperature 0–600 °C at 480 °C

Error sources

Results

Root-sum-square assumes the sources are independent and stated at the same confidence; convert per-cent-of-reading terms to span first.

Total probable error, root-sum-square (share of span)0.20347%
Worst-case error, straight sum (share of span)0.38000%
Total probable error, in span units0.32555
Total probable error as a share of reading0.31005%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Flow loop 0–100 t/h at 60 t/h. The inputs, in the units selected above:

InputValue
Span of the loop, in its own units100.00 -
Reading, in the same units60.000 -
Transmitter reference accuracy (share of span)0.075000 %
Ambient temperature effect (share of span)0.050000 %
Static pressure or other process effect (share of span)0.050000 %
Input card or indicator (share of span)0.10000 %
Other (calibrator, drift) (share of span)0.050000 %

Applying the formula below gives:

ResultValue
Total probable error, root-sum-square (share of span)0.15207 %
Worst-case error, straight sum (share of span)0.32500 %
Total probable error, in span units0.15207
Total probable error as a share of reading0.25345 %

Open this example in the calculator and change any input.

Formula

\(u = \sqrt{\sum e_i^2}, \quad u_{wc} = \sum e_i\)

\(u S, \quad u S / x\)

Variables

Symbol Meaning SI unit
\(S\) span units
\(x\) reading units
\(e_1\) transmitter accuracy -
\(e_2\) ambient effect -
\(e_3\) static pressure or process effect -
\(e_4\) input card -
\(e_5\) other -
\(e_i\) error term i (share of span) -
\(u\) root-sum-square error -
\(u_{wc}\) worst-case error -
\(u S\) error in span units units
\(u S / x\) error as a share of reading -

Method and standards

Independent random errors combine by root-sum-square; the straight sum is the worst case.

Where it is used

  • Error budgets for custody and efficiency-test measurements.
  • Comparing transmitter and card choices.
  • Answering audit questions on loop accuracy.

Common mistakes

  • Adding per-cent-of-reading and per-cent-of-span terms directly.
  • Combining errors at different confidence levels.
  • Treating systematic errors as random.

Assumptions and limits

  • Independent errors at the same confidence level. Makers' accuracy figures are often limits (rectangular) or 2σ values: convert them to one basis (as in the GUM, with a coverage factor) before combining; this tool does not.

References

  • Root-sum-square combination of independent errors

Questions and answers

What is the total error of a loop with 0.075 %, 0.05 %, 0.05 %, 0.1 % and 0.05 % terms?

About 0.15 % of span by root-sum-square, against 0.33 % worst case; at 60 % of span that is 0.25 % of reading.

Why root-sum-square?

Independent errors rarely all peak in the same direction at once, so their combination grows as the square root of the sum of squares.

Why does error grow at low readings?

Span-based errors are fixed in units, so as a share of a small reading they grow.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.