Largest loop resistance a 4–20 mA transmitter can drive from the supply and its lift-off voltage, the loop's actual resistance and the longest cable allowed.

Thermal power plantProcess steam and utilitiesRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: 24 V, 12 V lift-off, 22 mA, 250 Ω card, 500 m of 18.5 Ω/km24 V, 10.5 V, 21 mA, 250 Ω + 280 Ω barrier, 1 km of 36 Ω/km18 V, 11 V, 20 mA, 250 Ω, 2 km of 12 Ω/km

From the transmitter data sheet (lift-off voltage).

Results

Largest total loop resistance allowed545.45Ω
Actual loop resistance (loads plus both cores)268.50Ω
Spare resistance276.95Ω
Voltage at the transmitter at the highest current18.093V
Longest cable for these loads7,985.3m

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 24 V, 12 V lift-off, 22 mA, 250 Ω card, 500 m of 18.5 Ω/km. The inputs, in the units selected above:

InputValue
Loop supply voltage24.000 V
Lowest voltage the transmitter needs at its terminals12.000 V
Highest loop current to allow for (alarm or saturation)22.000 mA
Input resistance of the receiving card250.00 Ω
Other loads in the loop (barrier, indicator)0 Ω
Resistance of one cable core per length18.500 Ω/km
Cable length, one way500.00 m

Applying the formula below gives:

ResultValue
Largest total loop resistance allowed545.45 Ω
Actual loop resistance (loads plus both cores)268.50 Ω
Spare resistance276.95 Ω
Voltage at the transmitter at the highest current18.093 V
Longest cable for these loads7,985.3 m

Open this example in the calculator and change any input.

Formula

\(R_{max} = \frac{V_s - V_{min}}{I_{max}}, \quad R_{loop} = R_{in} + R_x + 2 r_c L\)

\(V_t = V_s - I_{max} R_{loop}, \quad L_{max} = \frac{R_{max} - R_{in} - R_x}{2 r_c}\)

Variables

Symbol Meaning SI unit
\(V_s\) Loop supply voltage V
\(V_{min}\) Lowest voltage the transmitter needs at its terminals V
\(I_{max}\) Highest loop current to allow for (alarm or saturation) A
\(R_{in}\) Input resistance of the receiving card Ω
\(R_x\) Other loads in the loop (barrier, indicator) Ω
\(r_c\) Resistance of one cable core per length Ω/m
\(L\) Cable length, one way m
\(R_{max}\) Largest total loop resistance allowed Ω
\(R_{loop}\) Actual loop resistance (loads plus both cores) Ω
\(R_{max} - R_{loop}\) Spare resistance Ω
\(V_t\) Voltage at the transmitter at the highest current V
\(L_{max}\) Longest cable for these loads m

Method and standards

A two-wire transmitter needs its minimum terminal voltage at the highest loop current; whatever the supply has left over can be dropped across the receiving card, barriers and both cable cores.

Where it is used

  • Checking long field loops and loops with barriers.
  • Choosing the supply voltage.
  • Diagnosing loops that saturate below 20 mA.

Common mistakes

  • Counting only one cable core.
  • Forgetting HART needs at least 250 Ω in the loop.
  • Using 20 mA when fault signalling goes higher.

Assumptions and limits

  • Steady current; supply at its lowest tolerance value if you enter it.
  • Cable resistance at the value entered: correct it for the hottest conductor temperature (about +0.4 % per K for copper), which reduces the margin.
  • With zero cable resistance no length limit is shown.

References

  • Two-wire 4–20 mA loop (IEC 60381-1 signal, transmitter load line)

Questions and answers

What load can a 24 V loop drive?

With 12 V lift-off at 22 mA, 545 Ω. A 250 Ω card and 500 m of 18.5 Ω/km cable use 269 Ω, leaving 277 Ω spare.

How far can the cable run?

About 8 km for those loads; a 280 Ω barrier and thinner cable cut it to about 1.6 km.

Why 22 mA and not 20?

Transmitters signal faults above 20 mA (NAMUR NE 43 uses 21 mA and more); the loop must still drive that current.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.