FireCADCalc

Rooftop Solar PV: Generation, Saving and Payback

First-year generation, bill saving, simple payback and 25-year generation of a rooftop solar PV plant from its size, specific yield, tariff and cost.

Inputs

Examples: 500 kWp50 kWp, no degradation

From a yield study or nearby plants; depends on site, tilt and losses.

Results

Self-consumed energy saves the full tariff; exported energy may earn less under your net-metering rules.

First-year generation (kWh)65,000
First-year net saving585,000
Simple payback on the first-year saving (years)4.2735
Generation over 25 years (kWh)1,625,000

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 500 kWp. The inputs, in the units selected above:

InputValue
Plant size (kWp)500.00 -
Specific yield (kWh per kWp per year)1,450.0 -
Tariff avoided per kWh8.0000 -
Installed cost per kWp45,000 -
Annual degradation0.50000 %
O&M per year (share of cost)1.0000 %

Applying the formula below gives:

ResultValue
First-year generation (kWh)725,000
First-year net saving5,575,000
Simple payback on the first-year saving (years)4.0359
Generation over 25 years (kWh)1.7078e+07

Open this example in the calculator and change any input.

Formula

\(E_1 = P_p Y, \quad S_1 = E_1 c - O\,C P_p, \quad E_{25} = E_1\frac{1 - (1 - d)^{25}}{d}, \quad t_{pb} = \frac{C P_p}{S_1}\ (S_1 > 0)\)

Variables

Symbol Meaning SI unit
\(P_p\) Plant size (kWp) -
\(Y\) Specific yield (kWh per kWp per year) -
\(c\) Tariff avoided per kWh -
\(C\) Installed cost per kWp -
\(d\) Annual degradation -
\(O\) O&M per year (share of cost) -
\(E_1\) First-year generation (kWh) -
\(S_1\) First-year net saving -
\(t_{pb}\) Simple payback on the first-year saving (years) -
\(E_{25}\) Generation over 25 years (kWh) -

Method and standards

Generation and saving.

Where it is used

  • Captive solar on plant roofs.
  • Quick feasibility.

Common mistakes

  • Peak sun hours used as yield.
  • Ignoring export tariff.

Assumptions and limits

  • Constant tariff; no discounting, tariff escalation, inverter replacement or separate export tariff (exported energy may earn less under net-metering rules).
  • The payback uses the first-year net saving; degradation, which slowly lowers later savings, is not included in it, so the real payback is slightly longer.
  • If the first-year saving does not cover O&M the plant never pays back and no payback is shown.

References

  • E = kWp × specific yield; degradation as a geometric series

Questions and answers

500 kWp at 1450 kWh/kWp, tariff 8, cost 45,000 per kWp?

725,000 kWh in year 1; payback about 4.0 years.

Specific yield?

Use a PVsyst-type study or nearby plant data.

Degradation?

Often 0.5–0.7 % a year after the first year.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.