Worked example
Example: 2 MW at 100 m, 6 m/s at 10 m. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Mean wind speed at the reference height | 6.0000 m/s |
| Reference height | 10.000 m |
| Hub height | 100.00 m |
| Shear exponent | 0.14000 - |
| Weibull shape factor | 2.0000 - |
| Rated power | 2,000.0 kW |
| Cut-in speed | 3.0000 m/s |
| Rated speed | 12.000 m/s |
| Cut-out speed | 25.000 m/s |
| Availability and other losses | 10.000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Mean speed at hub height | 8.2823 m/s |
| Weibull scale at hub height | 9.3456 m/s |
| Mean wind power density | 664.60 W/m² |
| Capacity factor | 36.018 % |
| Annual energy | 6,314.7 MWh |
Open this example in the calculator and change any input.
Formula
\(\bar v_h = \bar v_r\left(\frac{z_h}{z_r}\right)^\alpha, \quad c = \frac{\bar v_h}{\Gamma(1 + 1/k)}, \quad CF = (1 - f_l)\int P(v)f(v)\,dv / P_r, \quad E = CF\,P_r\,t_a, \quad \frac PA = \frac12\rho_0 c^3\,\Gamma\left(1 + \frac3k\right)\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\bar v_r\) | Mean wind speed at the reference height | m/s |
| \(z_r\) | Reference height | m |
| \(z_h\) | Hub height | m |
| \(\alpha\) | Shear exponent | - |
| \(k\) | Weibull shape factor | - |
| \(P_r\) | Rated power | W |
| \(v_{in}\) | Cut-in speed | m/s |
| \(v_r\) | Rated speed | m/s |
| \(v_{out}\) | Cut-out speed | m/s |
| \(f_l\) | Availability and other losses | - |
| \(\bar v_h\) | Mean speed at hub height | m/s |
| \(c\) | Weibull scale at hub height | m/s |
| \(P/A\) | Mean wind power density | W/m² |
| \(CF\) | Capacity factor | - |
| \(E\) | Annual energy | J |
| \(t_a\) | One year, 365.25 days (8 766 h) | s |
| \(\rho_0\) | Air density, fixed at 1.225 kg/m³ | kg/m³ |
Method and standards
Weibull integration.
Where it is used
- Wind farm screening for captive power.
- Comparing sites.
Common mistakes
- Using the mean speed in the cube.
- Ignoring shear to hub height.
Assumptions and limits
The year is 365.25 days (8 766 h), allowing for leap years; calculators that use 8 760 h give energy about 0.07 % lower.
The power density uses a fixed air density of 1.225 kg/m³ (sea level, 15 °C); scale it by the site density for altitude or temperature. The capacity factor comes from the normalised power curve and does not depend on density.
Weibull distribution; simplified power curve.
References
- Weibull wind statistics and power-law shear (Manwell, McGowan and Rogers, Wind Energy Explained, 2nd ed., ch. 2)
Questions and answers
Why not use the mean wind speed directly?
Power varies with v³; the spread of speeds about the mean carries much more energy than the mean alone suggests.
Why correct to hub height?
Wind speed rises with height; at 100 m it is often 35–40 % higher than at a 10 m met mast.
What do the defaults represent?
A 2 MW turbine on a 100 m tower at a site with 6 m/s mean at 10 m.