Power Factor Improvement: kVA Demand and Charge Saving

Reduction in maximum kVA demand and in the monthly demand charge from improving power factor, with the capacitor kvar needed and the payback.

Thermal power plantProcess steam and utilities

Inputs

Examples: 800 kW, 0.82 to 0.97300 kW, 0.75 to 0.95

Results

Add any power factor incentive or penalty in your tariff; watch for harmonics before adding capacitors.

Present kVA demand975.61kVA
kVA demand at the target824.74kVA
Capacitor needed357.90kvar
Demand charge saved per year633,643
Payback (months)8.1336

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 800 kW, 0.82 to 0.97. The inputs, in the units selected above:

InputValue
Maximum demand (active)800.00 kW
Present power factor82.000 %
Target power factor97.000 %
Demand charge per kVA per month350.00 -
Capacitor bank cost per kvar1,200.0 -

Applying the formula below gives:

ResultValue
Present kVA demand975.61 kVA
kVA demand at the target824.74 kVA
Capacitor needed357.90 kvar
Demand charge saved per year633,643
Payback (months)8.1336

Open this example in the calculator and change any input.

Formula

\(S = \frac{P}{\cos\varphi}, \quad Q_c = P(\tan\varphi_1 - \tan\varphi_2), \quad \Delta C = 12(S_1 - S_2)c_d\)

Variables

Symbol Meaning SI unit
\(P\) Maximum demand (active) W
\(\cos\varphi_1\) Present power factor -
\(\cos\varphi_2\) Target power factor -
\(c_d\) Demand charge per kVA per month -
\(c_c\) Capacitor bank cost per kvar -
\(S_1\) Present kVA demand VA
\(S_2\) kVA demand at the target VA
\(Q_c\) Capacitor needed var
\(\Delta C\) Demand charge saved per year -
\(t_{pb}\) Payback (months) -

Method and standards

Power triangle.

Where it is used

  • Electricity bill reduction.
  • Energy audits.

Common mistakes

  • Average instead of maximum demand.
  • Ignoring harmonics.

Assumptions and limits

  • Same active demand.

References

  • S = P/cos φ; Q_c = P(tan φ₁ − tan φ₂)

Questions and answers

800 kW from 0.82 to 0.97 at 350 per kVA a month?

Demand falls from 976 to 825 kVA: about 633,643 a year.

Capacitor size?

About 358 kvar.

Harmonics?

With VFDs present, use detuned capacitor banks.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.