Worked example
Example: 500 kWp. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Plant size (kWp) | 500.00 - |
| Specific yield (kWh per kWp per year) | 1,450.0 - |
| Tariff avoided per kWh | 8.0000 - |
| Installed cost per kWp | 45,000 - |
| Annual degradation | 0.50000 % |
| O&M per year (share of cost) | 1.0000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| First-year generation (kWh) | 725,000 |
| First-year net saving | 5,575,000 |
| Simple payback on the first-year saving (years) | 4.0359 |
| Generation over 25 years (kWh) | 1.7078e+07 |
Open this example in the calculator and change any input.
Formula
\(E_1 = P_p Y, \quad S_1 = E_1 c - O\,C P_p, \quad E_{25} = E_1\frac{1 - (1 - d)^{25}}{d}, \quad t_{pb} = \frac{C P_p}{S_1}\ (S_1 > 0)\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(P_p\) | Plant size (kWp) | - |
| \(Y\) | Specific yield (kWh per kWp per year) | - |
| \(c\) | Tariff avoided per kWh | - |
| \(C\) | Installed cost per kWp | - |
| \(d\) | Annual degradation | - |
| \(O\) | O&M per year (share of cost) | - |
| \(E_1\) | First-year generation (kWh) | - |
| \(S_1\) | First-year net saving | - |
| \(t_{pb}\) | Simple payback on the first-year saving (years) | - |
| \(E_{25}\) | Generation over 25 years (kWh) | - |
Method and standards
Generation and saving.
Where it is used
- Captive solar on plant roofs.
- Quick feasibility.
Common mistakes
- Peak sun hours used as yield.
- Ignoring export tariff.
Assumptions and limits
- Constant tariff; no discounting, tariff escalation, inverter replacement or separate export tariff (exported energy may earn less under net-metering rules).
- The payback uses the first-year net saving; degradation, which slowly lowers later savings, is not included in it, so the real payback is slightly longer.
- If the first-year saving does not cover O&M the plant never pays back and no payback is shown.
References
- E = kWp × specific yield; degradation as a geometric series
Questions and answers
500 kWp at 1450 kWh/kWp, tariff 8, cost 45,000 per kWp?
725,000 kWh in year 1; payback about 4.0 years.
Specific yield?
Use a PVsyst-type study or nearby plant data.
Degradation?
Often 0.5–0.7 % a year after the first year.