Worked example
Example: FGD-style scrubber. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Gas flow (actual) | 60,000 m³/h |
| Liquid recirculation flow | 120.00 m³/h |
| Target L/G | 3.0000 L/m³ |
| Water evaporated (saturation of the gas) | 1,500.0 kg/h |
| Blowdown | 2.0000 m³/h |
Applying the formula below gives:
| Result | Value |
|---|---|
| L/G | 2.0000 L/m³ |
| Liquid flow for the target | 180.00 m³/h |
| Make-up water (evaporation + blowdown) | 3.5000 m³/h |
Open this example in the calculator and change any input.
Formula
\(\frac{L}{G} = \frac{\dot V_l}{\dot V_g}\times1000, \quad \dot V_{mu} = \frac{\dot m_e}{\rho_w} + \dot V_b\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(\dot V_g\) | Gas flow (actual) | m³/s |
| \(\dot V_l\) | Liquid recirculation flow | m³/s |
| \((L/G)_t\) | Target L/G (L/m³) | - |
| \(\dot m_e\) | Water evaporated (saturation of the gas) | kg/s |
| \(\dot V_b\) | Blowdown | m³/s |
| \(L/G\) | L/G (L/m³) | - |
| \(\dot V_{l,t}\) | Liquid flow for the target | m³/s |
| \(\dot V_{mu}\) | Make-up water (evaporation + blowdown) | m³/s |
Method and standards
Ratios and balance.
Where it is used
- Scrubber operation and design checks.
- FGD and odour scrubbers.
Common mistakes
- Normal vs actual gas flow.
- Ignoring evaporation.
Assumptions and limits
- Steady operation.
- L/G is in litres per cubic metre of actual gas in every unit system.
- Drift (droplet carry-over) is not included in the make-up; add it to the blowdown if it is significant.
References
- L/G = liquid flow/gas flow; make-up = evaporation + blowdown (water balance)
Questions and answers
120 m³/h of liquid on 60,000 m³/h of gas?
L/G 2 L/m³; 3 L/m³ needs 180 m³/h.
Evaporation?
Hot gas saturates in the scrubber; use a psychrometric balance.
Venturis?
Usually 0.7–1.5 L/m³; spray towers more.