FireCADCalc

Wet Scrubber Liquid-to-Gas Ratio and Make-Up

Liquid-to-gas ratio of a wet scrubber in L/m³, the recirculation flow for a target L/G, and make-up water for evaporation and blowdown.

Thermal power plantSugar mill and cogenerationRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: FGD-style scrubberSmall odour scrubber

Results

L/G per actual gas volume; makers quote it either per actual or per saturated outlet gas, so check which.

L/G2.0000L/m³
Liquid flow for the target180.00m³/h
Make-up water (evaporation + blowdown)3.5000m³/h

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: FGD-style scrubber. The inputs, in the units selected above:

InputValue
Gas flow (actual)60,000 m³/h
Liquid recirculation flow120.00 m³/h
Target L/G3.0000 L/m³
Water evaporated (saturation of the gas)1,500.0 kg/h
Blowdown2.0000 m³/h

Applying the formula below gives:

ResultValue
L/G2.0000 L/m³
Liquid flow for the target180.00 m³/h
Make-up water (evaporation + blowdown)3.5000 m³/h

Open this example in the calculator and change any input.

Formula

\(\frac{L}{G} = \frac{\dot V_l}{\dot V_g}\times1000, \quad \dot V_{mu} = \frac{\dot m_e}{\rho_w} + \dot V_b\)

Variables

Symbol Meaning SI unit
\(\dot V_g\) Gas flow (actual) m³/s
\(\dot V_l\) Liquid recirculation flow m³/s
\((L/G)_t\) Target L/G (L/m³) -
\(\dot m_e\) Water evaporated (saturation of the gas) kg/s
\(\dot V_b\) Blowdown m³/s
\(L/G\) L/G (L/m³) -
\(\dot V_{l,t}\) Liquid flow for the target m³/s
\(\dot V_{mu}\) Make-up water (evaporation + blowdown) m³/s

Method and standards

Ratios and balance.

Where it is used

  • Scrubber operation and design checks.
  • FGD and odour scrubbers.

Common mistakes

  • Normal vs actual gas flow.
  • Ignoring evaporation.

Assumptions and limits

  • Steady operation.
  • L/G is in litres per cubic metre of actual gas in every unit system.
  • Drift (droplet carry-over) is not included in the make-up; add it to the blowdown if it is significant.

References

  • L/G = liquid flow/gas flow; make-up = evaporation + blowdown (water balance)

Questions and answers

120 m³/h of liquid on 60,000 m³/h of gas?

L/G 2 L/m³; 3 L/m³ needs 180 m³/h.

Evaporation?

Hot gas saturates in the scrubber; use a psychrometric balance.

Venturis?

Usually 0.7–1.5 L/m³; spray towers more.

Method and article reviewed by FireCAD engineering on 12 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.