Biofilter: Empty-Bed Contact Time, Loading and Elimination Capacity

Empty-bed contact time, bed area, surface and mass loading, elimination capacity and removal efficiency of a biofilter for odour or VOC control.

Thermal power plantSugar mill and cogenerationDistillery and ethanolRefinery and petrochemicalChemical and fertiliserPulp and paper

Inputs

Examples: 20 000 m3/h, 300 m3 bedH2S odour 5 000 m3/h

Results

Typical design: EBCT 15–60 s for odour, 30–120 s for VOCs; bed 1–1.5 m; keep the medium at 40–60 % moisture and the inlet humidified.

Empty-bed contact time43.200s
Bed area60.000m²
Surface loading83.333m/h
Mass loading0.002500kg/(m³·h)
Elimination capacity0.002450kg/(m³·h)
Removal efficiency98.000%

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 20 000 m3/h, 300 m3 bed. The inputs, in the units selected above:

InputValue
Gas flow20,000 m³/h
Bed volume300.00 m³
Bed depth1.2000 m
Inlet concentration200.00 mg/m³
Outlet concentration20.000 mg/m³

Applying the formula below gives:

ResultValue
Empty-bed contact time54.000 s
Bed area250.00 m²
Surface loading80.000 m/h
Mass loading0.013333 kg/(m³·h)
Elimination capacity0.012000 kg/(m³·h)
Removal efficiency90.000 %

Open this example in the calculator and change any input.

Formula

\(EBCT = \frac{V}{Q}, \quad L_m = \frac{QC_{in}}{V}, \quad EC = \frac{Q(C_{in} - C_{out})}{V}, \quad \eta = 1 - \frac{C_{out}}{C_{in}}\)

Variables

Symbol Meaning SI unit
\(Q\) Gas flow m³/s
\(V\) Bed volume m³
\(H\) Bed depth m
\(C_{in}\) Inlet concentration kg/m³
\(C_{out}\) Outlet concentration kg/m³
\(EBCT\) Empty-bed contact time s
\(A\) Bed area m²
\(q_s\) Surface loading m/s
\(L_m\) Mass loading kg/(m³·s)
\(EC\) Elimination capacity kg/(m³·s)
\(\eta\) Removal efficiency -

Method and standards

Biofilter definitions.

Where it is used

  • Effluent plant and composting odour control.
  • Low-concentration VOC vents.

Common mistakes

  • Overloading beyond the medium's elimination capacity.
  • Letting the bed dry out.

Assumptions and limits

  • Steady loading.
  • Loadings are shown in kg/(m³·h) (1 kg/(m³·h) = 1 000 g/(m³·h)); FPS in lb per 1 000 ft³ per day.

References

  • Cooper and Alley
  • Air Pollution Control: A Design Approach
  • 4th ed. (Waveland, 2011)
  • ch. 15 (biofiltration: EBCT, loading and elimination capacity)

Questions and answers

What is EBCT?

Bed volume divided by gas flow: the time the gas would take to pass the bed if it were empty.

What is elimination capacity?

Grams of pollutant removed per cubic metre of bed per hour; it levels off at high loading.

What do the defaults give?

20,000 m³/h through 300 m³ at 1.2 m: EBCT 54 s, 90 % removal of 200 mg/m³, elimination capacity about 12 g/(m³·h).

Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.