FireCADCalc

Slope Stakes: Catch Point Offset for Cut or Fill

Offset from the centreline and the cut or fill at the catch point where a road or channel side slope meets ground with a uniform cross slope.

Inputs

Examples: Illustrative fill, ground falling outwardCut on hillside rising outwardFill on ground rising outward

Accepted: 0.5 to 100 m
Accepted: 0.25 to 10
Accepted: -500 to 9,000 m
Accepted: -500 to 9,000 m
Accepted: -40 to 40 %

Results

The side slope leaves the shoulder at grade elevation and runs outward at s horizontal per 1 vertical; the ground runs from the centre at the cross slope. In fill: x = w + s(G − E(x)); in cut: x = w + s(E(x) − G), with E(x) = E₀ + g_x·x, solved directly for uniform ground. In the field the rodperson moves the stake by trial until the measured and computed offsets agree, because real ground is irregular.

Cut (+) or fill (−) at centreline2.8000m
Catch point offset from the centreline11.220m
Cut or fill height at the catch point4.1463m
Ground elevation at the catch point252.35m

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: Illustrative fill, ground falling outward. The inputs, in the units selected above:

InputValue
Half-width of the roadway (centre to shoulder)6.0000 m
Side slope (horizontal per 1 vertical)2.0000 -
Grade (finished) elevation at the centreline102.40 m
Ground elevation at the centreline100.10 m
Ground cross slope (rising outward +)-5.0000 %

Applying the formula below gives:

ResultValue
Cut (+) or fill (−) at centreline-2.3000 m
Catch point offset from the centreline11.778 m
Cut or fill height at the catch point2.8889 m
Ground elevation at the catch point99.511 m

Open this example in the calculator and change any input.

Formula

\(x = \frac{w + s|G - E_0|}{1 \pm sg_x}, \quad E_x = E_0 + g_xx\)

Variables

Symbol Meaning SI unit
\(w\) Half-width of the roadway (centre to shoulder) m
\(s\) Side slope (horizontal per 1 vertical) -
\(G\) Grade (finished) elevation at the centreline m
\(E_0\) Ground elevation at the centreline m
\(g_x\) Ground cross slope (rising outward +) -
\(c/f\) Cut (+) or fill (−) at centreline m
\(x\) Catch point offset from the centreline m
\(h\) Cut or fill height at the catch point m
\(E_x\) Ground elevation at the catch point m

Method and standards

Slope staking.

Where it is used

  • Road, railway and canal construction.
  • Earthwork volume cross-sections.

Common mistakes

  • Mixing slope ratio forms (1:2 versus 2:1).
  • Wrong sign of cross slope.

Assumptions and limits

  • Uniform ground cross slope; level roadway section.

References

  • Slope staking for earthwork

Questions and answers

Why is slope staking done by trial in the field?

Ground is seldom a uniform slope; the rodperson moves until the computed and measured offsets agree.

Is the cross slope sign important?

Yes: ground rising outward pushes a cut's catch point farther out and brings a fill's closer in.

What do the defaults represent?

An illustrative road with 6 m half-width and 2:1 side slopes, grade 102.40 m over ground at 100.10 m falling outward 5 %.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Sources

Ghilani and Wolf, Elementary Surveying: An Introduction to Geomatics, 13th ed. (Pearson, 2012)

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.