Worked example
Example: Illustrative fill, ground falling outward. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Half-width of the roadway (centre to shoulder) | 6.0000 m |
| Side slope (horizontal per 1 vertical) | 2.0000 - |
| Grade (finished) elevation at the centreline | 102.40 m |
| Ground elevation at the centreline | 100.10 m |
| Ground cross slope (rising outward +) | -5.0000 % |
Applying the formula below gives:
| Result | Value |
|---|---|
| Cut (+) or fill (−) at centreline | -2.3000 m |
| Catch point offset from the centreline | 11.778 m |
| Cut or fill height at the catch point | 2.8889 m |
| Ground elevation at the catch point | 99.511 m |
Open this example in the calculator and change any input.
Formula
\(x = \frac{w + s|G - E_0|}{1 \pm sg_x}, \quad E_x = E_0 + g_xx\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(w\) | Half-width of the roadway (centre to shoulder) | m |
| \(s\) | Side slope (horizontal per 1 vertical) | - |
| \(G\) | Grade (finished) elevation at the centreline | m |
| \(E_0\) | Ground elevation at the centreline | m |
| \(g_x\) | Ground cross slope (rising outward +) | - |
| \(c/f\) | Cut (+) or fill (−) at centreline | m |
| \(x\) | Catch point offset from the centreline | m |
| \(h\) | Cut or fill height at the catch point | m |
| \(E_x\) | Ground elevation at the catch point | m |
Method and standards
Slope staking.
Where it is used
- Road, railway and canal construction.
- Earthwork volume cross-sections.
Common mistakes
- Mixing slope ratio forms (1:2 versus 2:1).
- Wrong sign of cross slope.
Assumptions and limits
- Uniform ground cross slope; level roadway section.
References
- Slope staking for earthwork
Questions and answers
Why is slope staking done by trial in the field?
Ground is seldom a uniform slope; the rodperson moves until the computed and measured offsets agree.
Is the cross slope sign important?
Yes: ground rising outward pushes a cut's catch point farther out and brings a fill's closer in.
What do the defaults represent?
An illustrative road with 6 m half-width and 2:1 side slopes, grade 102.40 m over ground at 100.10 m falling outward 5 %.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Ghilani and Wolf, Elementary Surveying: An Introduction to Geomatics, 13th ed. (Pearson, 2012)