Worked example
Example: Illustrative sewer at 0.6 %. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Station of the starting invert | 0 m |
| Starting invert elevation | 96.250 m |
| Pipe grade (+ rising with stationing) | 0.60000 % |
| Stake station | 75.000 m |
| Elevation of the stake top | 99.842 m |
| Grade rod length | 3.0000 m |
Applying the formula below gives:
| Result | Value |
|---|---|
| Invert at the stake | 96.700 m |
| Cut from stake top to invert | 3.1420 m |
| Batter board elevation (invert + rod) | 99.700 m |
| Batter board height above the stake top | -142.00 mm |
Open this example in the calculator and change any input.
Formula
\(I = I_0 + g(Sta - Sta_0), \quad C = E_{stake} - I, \quad E_{BB} = I + L_{rod}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(Sta_0\) | Station of the starting invert | m |
| \(I_0\) | Starting invert elevation | m |
| \(g\) | Pipe grade (+ rising with stationing) | - |
| \(Sta\) | Stake station | m |
| \(E_{stake}\) | Elevation of the stake top | m |
| \(L_{rod}\) | Grade rod length | m |
| \(I\) | Invert at the stake | m |
| \(C\) | Cut from stake top to invert | m |
| \(E_{BB}\) | Batter board elevation (invert + rod) | m |
| \(h_{BB}\) | Batter board height above the stake top | m |
Method and standards
Grade stakes.
Where it is used
- Sewer and drain construction.
- Pipeline cut sheets.
Common mistakes
- Grade sign reversed.
- Staking to the crown instead of the invert.
Assumptions and limits
- Uniform grade between stations.
References
- Staking pipeline grades
Questions and answers
What is a cut sheet?
A table of stake stations with their cuts from stake top to invert, given to the excavation crew.
Why use batter boards?
A string at a fixed height above the invert lets the crew check grade continuously without an instrument.
What do the defaults represent?
An illustrative sewer rising at 0.6 % from invert 96.250 m at station 0, with a stake at station 75 m whose top is 99.842 m, and a 3 m grade rod.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Ghilani and Wolf, Elementary Surveying: An Introduction to Geomatics, 13th ed. (Pearson, 2012)