Worked example
Example: Illustrative 1,500 m at 450 m elevation. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Ground (horizontal) distance | 1,500.0 m |
| Mean orthometric height of the line | 450.00 m |
| Geoid undulation | -30.000 m |
| Grid scale factor of the projection | 0.99984 - |
| Earth radius (mean or R_α) | 6,371.0 km |
Applying the formula below gives:
| Result | Value |
|---|---|
| Elevation factor | 0.99993 |
| Combined factor | 0.99977 |
| Grid distance | 1,499.7 m |
| Grid minus ground | -338.86 mm |
| Combined factor in ppm | -225.91 |
Open this example in the calculator and change any input.
Formula
\(EF = \frac{R}{R + H + N}, \quad CF = EF\cdot k, \quad L_{grid} = L_g\cdot CF\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(L_g\) | Ground (horizontal) distance | m |
| \(H\) | Mean orthometric height of the line | m |
| \(N\) | Geoid undulation | m |
| \(k\) | Grid scale factor of the projection | - |
| \(R\) | Earth radius (mean or R_α) | m |
| \(EF\) | Elevation factor | - |
| \(CF\) | Combined factor | - |
| \(L_{grid}\) | Grid distance | m |
| \(L_{grid} - L_g\) | Grid minus ground | m |
| \((CF - 1)10^6\) | Combined factor in ppm | - |
Method and standards
Combined factor.
Where it is used
- Working in state plane, UTM or local grid coordinates.
- Converting GNSS grid distances to ground for construction.
Common mistakes
- Using orthometric height without the geoid.
- Applying the factor twice.
Assumptions and limits
- Spherical earth radius; mean factors along the line.
References
- Reduction of distances to a map projection grid
Questions and answers
Why do grid and ground distances differ?
Distances shrink when reduced from the ground to the ellipsoid and then stretch or shrink in the projection.
Which factor matters more?
At high elevations the elevation factor (about 16 ppm per 100 m); far from the central meridian the grid factor.
What do the defaults represent?
An illustrative 1,500 m ground line at 450 m elevation, geoid −30 m, grid scale factor 0.99984.
Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.
Sources
Ghilani and Wolf, Elementary Surveying: An Introduction to Geomatics, 13th ed. (Pearson, 2012)