Worked example
Example: 40 m/min, 1.8 m, 180 g/m2. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Fabric speed | 40.000 m/min |
| Fabric width | 1.8000 m |
| Dry fabric mass per m² | 180.00 g/m² |
| Moisture entering (kg water per kg dry fabric) | 0.65000 kg/kg |
| Moisture leaving | 0.070000 kg/kg |
| Heat per kg of water evaporated | 4.5000 MJ/kg |
| Fuel heating value | 46.000 MJ/kg |
Applying the formula below gives:
| Result | Value |
|---|---|
| Dry fabric | 777.60 kg/h |
| Water evaporated | 451.01 kg/h |
| Heat input | 563.76 kW |
| Fuel | 44.120 kg/h |
Open this example in the calculator and change any input.
Formula
\(\dot m_{dry} = vWG, \quad \dot E = \dot m_{dry}(X_1 - X_2), \quad Q = \dot E q, \quad \dot m_f = \frac{Q}{LHV}\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(v\) | Fabric speed | m/s |
| \(W\) | Fabric width | m |
| \(G\) | Dry fabric mass per m² | kg/m² |
| \(X_1\) | Moisture entering (kg water per kg dry fabric) | kg/kg |
| \(X_2\) | Moisture leaving | kg/kg |
| \(q\) | Heat per kg of water evaporated | J/kg |
| \(LHV\) | Fuel heating value | J/kg |
| \(\dot m_{dry}\) | Dry fabric | kg/s |
| \(\dot E\) | Water evaporated | kg/s |
| \(Q\) | Heat input | W |
| \(\dot m_f\) | Fuel | kg/s |
Method and standards
Water balance with specific heat use.
Where it is used
- Stenter energy audits.
Common mistakes
- Using wet-basis moisture.
- Using finished GSM including moisture.
Assumptions and limits
- Steady running.
- The heat use per kg of water is on the same (LHV) basis as the fuel heating value.
References
- Definitions and mass and energy balances
Questions and answers
What heat per kg water is typical?
4–6 MJ/kg for direct-fired stenters.
Why dry basis moisture?
Pick-up after the mangle is quoted per kg of dry fabric (60–80 % for cotton).
Where does the heat go?
Evaporation, exhaust air and fabric heating; exhaust is the largest loss.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.