Worked example
Example: Air-jet 700 ppm, 30 picks/cm. The inputs, in the units selected above:
| Input | Value |
|---|---|
| Loom speed (picks per minute) | 700.00 - |
| Picks per cm | 30.000 - |
| Loom efficiency | 88.000 % |
| Fabric mass per m² | 120.00 g/m² |
| Fabric width | 1.9000 m |
Applying the formula below gives:
| Result | Value |
|---|---|
| Fabric produced | 12.320 m/h |
| Picks inserted per hour | 36,960 |
| Fabric mass | 2.8090 kg/h |
Open this example in the calculator and change any input.
Formula
\(L = \frac{60\,n\,\eta}{100\,n_p}\ \ (L\ \text{in m/h},\ n\ \text{in picks/min},\ n_p\ \text{in picks/cm}), \quad n_h = 60\,n\,\eta, \quad \dot m = L\,W\,G\)
Variables
| Symbol | Meaning | SI unit |
|---|---|---|
| \(n\) | Loom speed (picks per minute) | - |
| \(n_p\) | Picks per cm | - |
| \(\eta\) | Loom efficiency | - |
| \(G\) | Fabric mass per m² | kg/m² |
| \(W\) | Fabric width | m |
| \(L\) | Fabric produced | m/s |
| \(n_h\) | Picks inserted per hour | - |
| \(\dot m\) | Fabric mass | kg/s |
Method and standards
Weaving production definition.
Where it is used
- Weaving capacity planning.
Common mistakes
- Using picks per inch as per cm.
- Ignoring efficiency.
Assumptions and limits
- Steady running.
References
- Definitions and mass and energy balances
Questions and answers
What speed do air-jet looms reach?
800–1,200 picks per minute; rapiers 500–700.
Why use picks per cm?
Fabric length = picks inserted / pick density.
What efficiency is good?
85–92 % on modern looms.
Method and article reviewed by FireCAD engineering on 13 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.