FireCADCalc

Explosion Overpressure by TNT Equivalence

TNT-equivalent mass of a vapour cloud or explosive, scaled distance and peak side-on overpressure at a distance from the Kinney–Graham curve fit.

Process steam and utilitiesDistillery and ethanolRefinery and petrochemicalChemical and fertiliser

Inputs

Examples: 1 t hydrocarbon at 5 %, 100 m10 t propane at 3 %, 250 m1 kg TNT at 5 m

Results

TNT equivalence over-predicts near a vapour cloud explosion and under-predicts far away, because vapour clouds deflagrate; congested-area methods (TNO multi-energy, Baker–Strehlow) are better for plant layout.

A screening estimate for training and early design, not a hazard or risk study.

About 14–70 kPa: severe structural damage; lung haemorrhage becomes possible near the top of this range.

Equivalent mass of TNT1.0000kg
Scaled distance r/m_TNT^(1/3)5.0000
Peak side-on overpressure58.476kPa
Scaled overpressure0.57712

Download PDF CSV Link to this result Compare another case

Log in to save calculations to your dashboard.

Worked example

Example: 1 t hydrocarbon at 5 %, 100 m. The inputs, in the units selected above:

InputValue
Mass of flammable material in the cloud1,000.0 kg
Heat of combustion (energy of explosion)46,000 kJ/kg
Explosion efficiency (1–10 % for vapour clouds)5.0000 %
Distance from the explosion centre100.00 m
Ambient pressure101.33 kPa

Applying the formula below gives:

ResultValue
Equivalent mass of TNT490.82 kg
Scaled distance r/m_TNT^(1/3)12.677
Peak side-on overpressure14.804 kPa
Scaled overpressure0.14611

Open this example in the calculator and change any input.

Formula

\(m_{TNT} = \frac{\eta\,m\,\Delta H_c}{E_{TNT}},\ E_{TNT} = 4686\ \text{kJ/kg}, \quad z_e = \frac{r}{m_{TNT}^{1/3}}\)

\(\frac{p^o}{p_a} = \frac{1616\left[1 + \left(\frac{z_e}{4.5}\right)^2\right]}{\sqrt{\left[1 + \left(\frac{z_e}{0.048}\right)^2\right]\left[1 + \left(\frac{z_e}{0.32}\right)^2\right]\left[1 + \left(\frac{z_e}{1.35}\right)^2\right]}}\)

Variables

Symbol Meaning SI unit
\(m\) Mass of flammable material in the cloud kg
\(\Delta H_c\) Heat of combustion (energy of explosion) J/kg
\(\eta\) Explosion efficiency (1–10 % for vapour clouds) -
\(r\) Distance from the explosion centre m
\(p_a\) Ambient pressure Pa
\(m_{TNT}\) Equivalent mass of TNT kg
\(z_e\) Scaled distance r/m_TNT^(1/3) -
\(p^o\) Peak side-on overpressure Pa
\(p^o/p_a\) Scaled overpressure -

Method and standards

TNT equivalence with the Kinney–Graham fit of the TNT overpressure curve (z_e in m/kg^(1/3)).

Where it is used

  • Siting of control rooms and occupied buildings (screening).
  • Training on explosion consequences.

Common mistakes

  • Using 100 % efficiency for vapour clouds.
  • Applying it close to a congested area without a congestion-based method.

Assumptions and limits

  • Hemispherical free-field blast; ideal TNT curve.

References

  • Crowl and Louvar
  • Chemical Process Safety: Fundamentals with Applications
  • 2nd ed. (Prentice Hall, 2002)
  • ch. 6
  • eqs. 6-25
  • 6-27 and 6-28 (Kinney and Graham)

Questions and answers

What explosion efficiency should I use?

Usually 1–10 % for vapour clouds, reflecting incomplete mixing and the low conversion of combustion energy into blast; 100 % for condensed explosives.

What overpressure breaks windows?

Around 1–2 kPa; light structures fail at about 7–14 kPa and reinforced buildings near 70 kPa.

What do the defaults represent?

1 t of hydrocarbon (46 MJ/kg) at 5 % efficiency, 100 m from the centre.

Method and article reviewed by FireCAD engineering on 17 November 2026. Every result is checked against an independent calculation on each release: how we verify our calculators.

Related calculators

Free engineering calculators: every page computes in SI and converts to your units. Results are for engineering estimation; verify critical designs against the referenced standards.

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.